Finite element model of Cairo metro tunnel-Line 3 performance
The Greater Cairo metro-Line 3, the major project of underground structure in Cairo city, Egypt, is currently under constructed. Ground movement is expected during the construction with tunneling boring machine as Cairo metro tunnel passes through sand soil. In the present study, finite element mode...
Main Authors: | S.A. Mazek, H.A. Almannaei |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2013-12-01
|
Series: | Ain Shams Engineering Journal |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2090447913000427 |
Similar Items
-
Influence of Cairo Metro Tunnel Excavation on Pile Deep Foundation of the Adjacent Underground Structures: Numerical Study
by: Mo’men Ayasrah, et al.
Published: (2021-03-01) -
EVALUATION OF THE SURFACE SETTLEMENT ABOVE THE PRAGUE METRO LINE A EXTENSION CONSTRUCTED BY TWO SHIELDS
by: Matous Hilar, et al.
Published: (2016-12-01) -
Quantitative Analysis of Soil Displacement Induced by Ground Loss and Shield Machine Mechanical Effect in Metro Tunnel Construction
by: Yimo Zhu, et al.
Published: (2019-07-01) -
Prediction on Ground Settlement Deformation and Influence of Urban Buildings in the Construction Process of Existing Tunnel Reconstruction
by: Liu, M., et al.
Published: (2022) -
Noise levels inside the coaches of Greater Cairo tunnel metro, line 3 tunnel
by: Soha Eldakdoky, et al.
Published: (2021-06-01)