Impact of operation on the geometric parameters of the track in ballastless track transition area
The paper deals with the methodology and results of diagnostics in test sections near the tunnel portals of newly built tunnel Turecký vrch on modernized line Nové Mesto nad Váhom – Púchov. Based on the diagnostics results, transition areas are problematic sections of the construction. Transition ar...
Main Authors: | Ižvolt Libor, Šmalo Michal, Šestáková Janka |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2017-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201710700019 |
Similar Items
-
The railway superstructure monitoring in bratislava tunnel no. 1 – section of ballastless track and its transition areas
by: Izvolt Libor, et al.
Published: (2017-01-01) -
The quality evaluation of the ballastless track construction in the area of Bratislava tunnel no. 1
by: Ižvolt Libor, et al.
Published: (2016-01-01) -
Diagnostics of Track Quality of Ballastless Track and Transition Areas in Vicinity of Portals of Tunnel Turecky vrch
by: Šmalo Michal
Published: (2016-05-01) -
Degradation - Prediction Models of the Railway Track Quality
by: Šestaková Janka, et al.
Published: (2019-12-01) -
Quality of Slab Track Construction – Track Alignment Design and Track Geometry
by: Šestáková Janka