A New Dynamic Multicriteria Decision-Making Approach for Green Supplier Selection in Construction Projects under Time Sequence
Nowadays, due to the lack of natural resources and environment problems which have been appearing increasingly, green building is more and more involved in the construction industry. The evaluation and selection of green supplier are a significant part of the development of green building. In this p...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2017-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2017/7954784 |
id |
doaj-f88663cf7893451794534c3b09b7bc68 |
---|---|
record_format |
Article |
spelling |
doaj-f88663cf7893451794534c3b09b7bc682020-11-25T01:06:37ZengHindawi LimitedMathematical Problems in Engineering1024-123X1563-51472017-01-01201710.1155/2017/79547847954784A New Dynamic Multicriteria Decision-Making Approach for Green Supplier Selection in Construction Projects under Time SequenceShi Yin0Baizhou Li1Hengmin Dong2Zeyu Xing3School of Economics and Management, Harbin Engineering University, Harbin, Heilongjiang Province 150001, ChinaSchool of Economics and Management, Harbin Engineering University, Harbin, Heilongjiang Province 150001, ChinaSchool of Economics and Management, Harbin Engineering University, Harbin, Heilongjiang Province 150001, ChinaSchool of Economics and Management, Harbin Engineering University, Harbin, Heilongjiang Province 150001, ChinaNowadays, due to the lack of natural resources and environment problems which have been appearing increasingly, green building is more and more involved in the construction industry. The evaluation and selection of green supplier are a significant part of the development of green building. In this paper, we propose a new dynamic multicriteria decision-making approach in construction projects under time sequence to deal with these problems. First, the paper establishes 4 main criteria and 17 subcriteria for green supplier selection in construction projects. Then, a method considering interaction between criteria and the influence of constructors subjective preference and objective criteria information is proposed. It uses the interval-valued intuitionistic fuzzy geometric weighted Heronian means (IVIFGWHM) operator and multitarget nonlinear programming model to calculate the comprehensive evaluation results of potential green suppliers. The proposed method is much easier for constructors to select green supplier and make the localization of green supplier more practical and accurate in construction projects. Finally, a case study about a green building project is given to verify practicality and effectiveness of the proposed approach.http://dx.doi.org/10.1155/2017/7954784 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Shi Yin Baizhou Li Hengmin Dong Zeyu Xing |
spellingShingle |
Shi Yin Baizhou Li Hengmin Dong Zeyu Xing A New Dynamic Multicriteria Decision-Making Approach for Green Supplier Selection in Construction Projects under Time Sequence Mathematical Problems in Engineering |
author_facet |
Shi Yin Baizhou Li Hengmin Dong Zeyu Xing |
author_sort |
Shi Yin |
title |
A New Dynamic Multicriteria Decision-Making Approach for Green Supplier Selection in Construction Projects under Time Sequence |
title_short |
A New Dynamic Multicriteria Decision-Making Approach for Green Supplier Selection in Construction Projects under Time Sequence |
title_full |
A New Dynamic Multicriteria Decision-Making Approach for Green Supplier Selection in Construction Projects under Time Sequence |
title_fullStr |
A New Dynamic Multicriteria Decision-Making Approach for Green Supplier Selection in Construction Projects under Time Sequence |
title_full_unstemmed |
A New Dynamic Multicriteria Decision-Making Approach for Green Supplier Selection in Construction Projects under Time Sequence |
title_sort |
new dynamic multicriteria decision-making approach for green supplier selection in construction projects under time sequence |
publisher |
Hindawi Limited |
series |
Mathematical Problems in Engineering |
issn |
1024-123X 1563-5147 |
publishDate |
2017-01-01 |
description |
Nowadays, due to the lack of natural resources and environment problems which have been appearing increasingly, green building is more and more involved in the construction industry. The evaluation and selection of green supplier are a significant part of the development of green building. In this paper, we propose a new dynamic multicriteria decision-making approach in construction projects under time sequence to deal with these problems. First, the paper establishes 4 main criteria and 17 subcriteria for green supplier selection in construction projects. Then, a method considering interaction between criteria and the influence of constructors subjective preference and objective criteria information is proposed. It uses the interval-valued intuitionistic fuzzy geometric weighted Heronian means (IVIFGWHM) operator and multitarget nonlinear programming model to calculate the comprehensive evaluation results of potential green suppliers. The proposed method is much easier for constructors to select green supplier and make the localization of green supplier more practical and accurate in construction projects. Finally, a case study about a green building project is given to verify practicality and effectiveness of the proposed approach. |
url |
http://dx.doi.org/10.1155/2017/7954784 |
work_keys_str_mv |
AT shiyin anewdynamicmulticriteriadecisionmakingapproachforgreensupplierselectioninconstructionprojectsundertimesequence AT baizhouli anewdynamicmulticriteriadecisionmakingapproachforgreensupplierselectioninconstructionprojectsundertimesequence AT hengmindong anewdynamicmulticriteriadecisionmakingapproachforgreensupplierselectioninconstructionprojectsundertimesequence AT zeyuxing anewdynamicmulticriteriadecisionmakingapproachforgreensupplierselectioninconstructionprojectsundertimesequence AT shiyin newdynamicmulticriteriadecisionmakingapproachforgreensupplierselectioninconstructionprojectsundertimesequence AT baizhouli newdynamicmulticriteriadecisionmakingapproachforgreensupplierselectioninconstructionprojectsundertimesequence AT hengmindong newdynamicmulticriteriadecisionmakingapproachforgreensupplierselectioninconstructionprojectsundertimesequence AT zeyuxing newdynamicmulticriteriadecisionmakingapproachforgreensupplierselectioninconstructionprojectsundertimesequence |
_version_ |
1725189142480945152 |