CALCULATION PECULIARITIES OF RE-PROCESSED ROAD COVERING UNIT COST
In the article there are considered questions of economic expediency of non-waste technology application for road covering repair and restoration. Determined the conditions of asphalt-concrete processing at plants. Carried out cost changing analysis of asphalt granulate considering the conditions of...
Main Authors: | Dilyara Kyazymovna Izmaylova, Nikolay Dmitrievich Seliverstov |
---|---|
Format: | Article |
Language: | English |
Published: |
Science and Innovation Center Publishing House
2017-09-01
|
Series: | International Journal of Advanced Studies |
Subjects: | |
Online Access: | http://journal-s.org/index.php/ijas/article/view/10123 |
Similar Items
-
WORKING MACHINE-HOUR COST COMPARISON OF MODERN ROAD COVERAGE PROCESSING MECHANIZATION
by: Dilyara Kyazymovna Izmaylova, et al.
Published: (2017-09-01) -
ECONOMIC INDICATORS OF ROAD SURFACES RECONSTRUCTIONS IN THE WORLD USING NON-WASTE TECHNOLOGY
by: Dilyara Kyazymovna Izmaylova, et al.
Published: (2017-05-01) -
ECONOMY OF A NON-WASTE ROAD REPAIRING AND COVERING TECHNOLOGY IN DIFFERENT COUNTRIES
by: Dilyara Kyazymovna Izmaylova, et al.
Published: (2017-05-01) -
Evaluation of incorporating plastic wastes into asphalt materials for road construction in Ghana
by: Patricia Nana Ama Asare, et al.
Published: (2019-01-01) -
Use of reclaimed asphalt pavement – necessity and innovation
by: Wojciech Bańkowski, et al.
Published: (2016-04-01)