An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase

The revitalization of hydro-aggregates should be performed before the life-time expiry of most their parts. But, as in our practice aggregates have been under exploitation much longer then theoretical life-time advices (40, even 50 years), there is a need to estimate the equipment's condition t...

Full description

Bibliographic Details
Main Authors: Petrović Dragan, Vidaković Veljko, Ćirić Zoran, Stojković Siniša, Benišek Miroslav, Božić Ivan, Dragić Milorad, Zeljić Milorad
Format: Article
Language:English
Published: VINCA Institute of Nuclear Sciences 2006-01-01
Series:Thermal Science
Subjects:
Online Access:http://www.doiserbia.nb.rs/img/doi/0354-9836/2006/0354-98360604017P.pdf
id doaj-f65b37189a6d4cd1bd41212e1092b9e3
record_format Article
spelling doaj-f65b37189a6d4cd1bd41212e1092b9e32021-01-02T02:59:49ZengVINCA Institute of Nuclear SciencesThermal Science0354-98362334-71632006-01-01104173210.2298/TSCI0604017P0354-98360604017PAn increase of hydro-aggregate's installed power and efficiency factor before the revitalization phasePetrović Dragan0Vidaković Veljko1Ćirić Zoran2Stojković Siniša3Benišek Miroslav4Božić Ivan5Dragić Milorad6Zeljić Milorad7Faculty of Electrical Engineering, BelgradeHE Ðerdap, KladovoElectrical Institute Nikola Tesla, BelgradeFaculty of Electrical Engineering, BelgradeFaculty of Mechanical Engineering, BelgradeFaculty of Mechanical Engineering, BelgradeHE Zvornik, M. ZvornikHE Zvornik, M. ZvornikThe revitalization of hydro-aggregates should be performed before the life-time expiry of most their parts. But, as in our practice aggregates have been under exploitation much longer then theoretical life-time advices (40, even 50 years), there is a need to estimate the equipment's condition through more sophisticated monitoring, providing the maximum level of safety and availability with minimum investment expenses, before the revitalization finally takes place. That estimation is based on appropriating calculations and measurements needed to take the competent decision. Results of that analysis can be also useful for estimation of the aggregate's power and parameters after the revitalization. In this paper the results of appropriate calculations and measurements for the Hydropower station HE Zvornik are given. .http://www.doiserbia.nb.rs/img/doi/0354-9836/2006/0354-98360604017P.pdfhydro-aggregatespower increasingcalculationsmeasurementsefficiency increasing
collection DOAJ
language English
format Article
sources DOAJ
author Petrović Dragan
Vidaković Veljko
Ćirić Zoran
Stojković Siniša
Benišek Miroslav
Božić Ivan
Dragić Milorad
Zeljić Milorad
spellingShingle Petrović Dragan
Vidaković Veljko
Ćirić Zoran
Stojković Siniša
Benišek Miroslav
Božić Ivan
Dragić Milorad
Zeljić Milorad
An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase
Thermal Science
hydro-aggregates
power increasing
calculations
measurements
efficiency increasing
author_facet Petrović Dragan
Vidaković Veljko
Ćirić Zoran
Stojković Siniša
Benišek Miroslav
Božić Ivan
Dragić Milorad
Zeljić Milorad
author_sort Petrović Dragan
title An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase
title_short An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase
title_full An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase
title_fullStr An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase
title_full_unstemmed An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase
title_sort increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase
publisher VINCA Institute of Nuclear Sciences
series Thermal Science
issn 0354-9836
2334-7163
publishDate 2006-01-01
description The revitalization of hydro-aggregates should be performed before the life-time expiry of most their parts. But, as in our practice aggregates have been under exploitation much longer then theoretical life-time advices (40, even 50 years), there is a need to estimate the equipment's condition through more sophisticated monitoring, providing the maximum level of safety and availability with minimum investment expenses, before the revitalization finally takes place. That estimation is based on appropriating calculations and measurements needed to take the competent decision. Results of that analysis can be also useful for estimation of the aggregate's power and parameters after the revitalization. In this paper the results of appropriate calculations and measurements for the Hydropower station HE Zvornik are given. .
topic hydro-aggregates
power increasing
calculations
measurements
efficiency increasing
url http://www.doiserbia.nb.rs/img/doi/0354-9836/2006/0354-98360604017P.pdf
work_keys_str_mv AT petrovicdragan anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT vidakovicveljko anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT ciriczoran anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT stojkovicsinisa anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT benisekmiroslav anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT bozicivan anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT dragicmilorad anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT zeljicmilorad anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT petrovicdragan increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT vidakovicveljko increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT ciriczoran increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT stojkovicsinisa increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT benisekmiroslav increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT bozicivan increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT dragicmilorad increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
AT zeljicmilorad increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase
_version_ 1724361569155940352