An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase
The revitalization of hydro-aggregates should be performed before the life-time expiry of most their parts. But, as in our practice aggregates have been under exploitation much longer then theoretical life-time advices (40, even 50 years), there is a need to estimate the equipment's condition t...
Main Authors: | , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
VINCA Institute of Nuclear Sciences
2006-01-01
|
Series: | Thermal Science |
Subjects: | |
Online Access: | http://www.doiserbia.nb.rs/img/doi/0354-9836/2006/0354-98360604017P.pdf |
id |
doaj-f65b37189a6d4cd1bd41212e1092b9e3 |
---|---|
record_format |
Article |
spelling |
doaj-f65b37189a6d4cd1bd41212e1092b9e32021-01-02T02:59:49ZengVINCA Institute of Nuclear SciencesThermal Science0354-98362334-71632006-01-01104173210.2298/TSCI0604017P0354-98360604017PAn increase of hydro-aggregate's installed power and efficiency factor before the revitalization phasePetrović Dragan0Vidaković Veljko1Ćirić Zoran2Stojković Siniša3Benišek Miroslav4Božić Ivan5Dragić Milorad6Zeljić Milorad7Faculty of Electrical Engineering, BelgradeHE Ðerdap, KladovoElectrical Institute Nikola Tesla, BelgradeFaculty of Electrical Engineering, BelgradeFaculty of Mechanical Engineering, BelgradeFaculty of Mechanical Engineering, BelgradeHE Zvornik, M. ZvornikHE Zvornik, M. ZvornikThe revitalization of hydro-aggregates should be performed before the life-time expiry of most their parts. But, as in our practice aggregates have been under exploitation much longer then theoretical life-time advices (40, even 50 years), there is a need to estimate the equipment's condition through more sophisticated monitoring, providing the maximum level of safety and availability with minimum investment expenses, before the revitalization finally takes place. That estimation is based on appropriating calculations and measurements needed to take the competent decision. Results of that analysis can be also useful for estimation of the aggregate's power and parameters after the revitalization. In this paper the results of appropriate calculations and measurements for the Hydropower station HE Zvornik are given. .http://www.doiserbia.nb.rs/img/doi/0354-9836/2006/0354-98360604017P.pdfhydro-aggregatespower increasingcalculationsmeasurementsefficiency increasing |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Petrović Dragan Vidaković Veljko Ćirić Zoran Stojković Siniša Benišek Miroslav Božić Ivan Dragić Milorad Zeljić Milorad |
spellingShingle |
Petrović Dragan Vidaković Veljko Ćirić Zoran Stojković Siniša Benišek Miroslav Božić Ivan Dragić Milorad Zeljić Milorad An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase Thermal Science hydro-aggregates power increasing calculations measurements efficiency increasing |
author_facet |
Petrović Dragan Vidaković Veljko Ćirić Zoran Stojković Siniša Benišek Miroslav Božić Ivan Dragić Milorad Zeljić Milorad |
author_sort |
Petrović Dragan |
title |
An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase |
title_short |
An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase |
title_full |
An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase |
title_fullStr |
An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase |
title_full_unstemmed |
An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase |
title_sort |
increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase |
publisher |
VINCA Institute of Nuclear Sciences |
series |
Thermal Science |
issn |
0354-9836 2334-7163 |
publishDate |
2006-01-01 |
description |
The revitalization of hydro-aggregates should be performed before the life-time expiry of most their parts. But, as in our practice aggregates have been under exploitation much longer then theoretical life-time advices (40, even 50 years), there is a need to estimate the equipment's condition through more sophisticated monitoring, providing the maximum level of safety and availability with minimum investment expenses, before the revitalization finally takes place. That estimation is based on appropriating calculations and measurements needed to take the competent decision. Results of that analysis can be also useful for estimation of the aggregate's power and parameters after the revitalization. In this paper the results of appropriate calculations and measurements for the Hydropower station HE Zvornik are given. . |
topic |
hydro-aggregates power increasing calculations measurements efficiency increasing |
url |
http://www.doiserbia.nb.rs/img/doi/0354-9836/2006/0354-98360604017P.pdf |
work_keys_str_mv |
AT petrovicdragan anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT vidakovicveljko anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT ciriczoran anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT stojkovicsinisa anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT benisekmiroslav anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT bozicivan anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT dragicmilorad anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT zeljicmilorad anincreaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT petrovicdragan increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT vidakovicveljko increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT ciriczoran increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT stojkovicsinisa increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT benisekmiroslav increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT bozicivan increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT dragicmilorad increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase AT zeljicmilorad increaseofhydroaggregatesinstalledpowerandefficiencyfactorbeforetherevitalizationphase |
_version_ |
1724361569155940352 |