An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase

The revitalization of hydro-aggregates should be performed before the life-time expiry of most their parts. But, as in our practice aggregates have been under exploitation much longer then theoretical life-time advices (40, even 50 years), there is a need to estimate the equipment's condition t...

Full description

Bibliographic Details
Main Authors: Petrović Dragan, Vidaković Veljko, Ćirić Zoran, Stojković Siniša, Benišek Miroslav, Božić Ivan, Dragić Milorad, Zeljić Milorad
Format: Article
Language:English
Published: VINCA Institute of Nuclear Sciences 2006-01-01
Series:Thermal Science
Subjects:
Online Access:http://www.doiserbia.nb.rs/img/doi/0354-9836/2006/0354-98360604017P.pdf
Description
Summary:The revitalization of hydro-aggregates should be performed before the life-time expiry of most their parts. But, as in our practice aggregates have been under exploitation much longer then theoretical life-time advices (40, even 50 years), there is a need to estimate the equipment's condition through more sophisticated monitoring, providing the maximum level of safety and availability with minimum investment expenses, before the revitalization finally takes place. That estimation is based on appropriating calculations and measurements needed to take the competent decision. Results of that analysis can be also useful for estimation of the aggregate's power and parameters after the revitalization. In this paper the results of appropriate calculations and measurements for the Hydropower station HE Zvornik are given. .