Interim Report by Asia International Grid Connection Study Group
The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies...
Main Author: | Omatsu Ryo |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://doi.org/10.1051/e3sconf/20182701004 |
Similar Items
-
Prodigy Interim Report
by: Ian Purves, et al.
Published: (1996-09-01) -
Interim Access to the International Space Station
by: Smith, Tyson Karl
Published: (2009) -
The Interim Denture – A Case Report
by: Mihaela Pauna, et al.
Published: (2010-01-01) -
AN INTERIM REPORT ON SOFT SYSTEMS EVALUATION
by: Viljem Rupnik
Published: (2011-02-01) -
Institutional Issues of International Power Grid Development in Northeast Asia
by: Korneev Konstantin, et al.
Published: (2018-01-01)