A numerical and an analytical method for optimum planting date determination
Apart from number and size of machines in a farm, operations scheduling can also affect timeliness costs. In this study a new equation was presented for determination of timeliness costs and it was proven that the new equation is a generalization of the well-known ASABE standard equation. Based on t...
Main Authors: | Mahdi Khani, Alireza Keyhani, Reza Alimardani, Hooman Sharifnasab, Gholamreza Peykani |
---|---|
Format: | Article |
Language: | English |
Published: |
KeAi Communications Co., Ltd.
2015-05-01
|
Series: | Information Processing in Agriculture |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2214317315000116 |
Similar Items
-
Timeliness Harvesting Loss of Rice in Cold Region under Different Mechanical Harvesting Methods
by: Jinwu Wang, et al.
Published: (2021-06-01) -
Timeliness of Operating Room Case Planning and Time Utilization: Influence of First and To-Follow Cases
by: Konrad Meissner, et al.
Published: (2017-04-01) -
Development of methodology for time management of construction projects
by: S. V. Bovteev, et al.
Published: (2016-08-01) -
Relationship between Timing of Financial Reporting and Firms Performance at Tehran Stock Exchange
by: Atefe Rahimi Tamrin, et al.
Published: (2014-03-01) -
COORDINATION OF REPRODUCTIVE CYCLES OF EFFICIENCY OF THE ENTERPRISE ACTIVITY
by: I. Gontareva
Published: (2014-06-01)