Summary: | This paper presents EDF practice about concrete structure ageing management, from the mechanisms analysis to the formal procedure which allows the French company to increase 900 MWe NPP lifetime until 40 years; it will also introduce its action plan for 60 years lifetime extension. This practice is based on a methodology which identifies every ageing mechanism; both plants feedback and state of the art are screened and conclusions are drawn up into an “ageing analysis data sheet”. That leads at first to a collection of 57 data sheets which give the mechanism identification, the components that are concerned and an analysis grid which is designed to assess the safety risk. This analysis screens the reference documents describing the mechanism, the design lifetime hypotheses, the associated regulation or codification, the feedback experiences, the accessibility, the maintenance actions, the repair possibility and so one. This analysis has to lead to a conclusion about the risk taking into account monitoring and maintenance. If the data sheet conclusion is not clear enough, then a more detailed report is launched. The technical document which is needed, is a formal detailed report which summarizes every theoretical knowledge and monitoring data: its objective is to propose a solution for ageing management: this solution can include more inspections or specific research development, or additional maintenance. After a first stage on the 900 MWe units, only two generic ageing management detailed reports have been needed for the civil engineering part: one about reactor building containment, and one about other structures which focuses on concrete inflating reactions. The second stage consists on deriving this generic analysis (ageing mechanism and detailed reports) to every plant where a complete ageing report is required (one report for all equipments and structures of the plant, but specific for each reactor). This ageing management is a continuous process because the 57 generic data sheets set is updated every year and the detailed generic reports every five years. After this 40 year lifetime extension, EDF is preparing a 60 years lifetime action plan which includes R&D actions, specific industrial studies and also monitoring improvements.
|