A Preliminary Techno-Economic Analysis on the Calcium Looping Process with Simultaneous Capture of CO<sub>2</sub> and SO<sub>2</sub> from a Coal-Based Combustion Power Plant

The increase of capital investments and operation and maintenance (O&M) costs represents a current limitation to the diffusion of carbon capture systems for the clean combustion of fossil fuels. However, post-combustion systems, such as calcium looping (CaL), for CO<sub>2</sub> captu...

Full description

Bibliographic Details
Main Authors: Antonio Coppola, Fabrizio Scala
Format: Article
Language:English
Published: MDPI AG 2020-05-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/13/9/2176