Study on the application of shutdown factors to investment management of 35 kV and above power grid infrastructure projects
With the strengthening of external supervision and the management requirements of internal quality and efficiency improvement of power grid, it is particularly important to improve the lean level of power grid investment. However, the accuracy and scientificity of the current grid infrastructure pro...
Main Authors: | Zhou Ming, Lu Shengwei, Wu Qiang, Jin Sha, Yan Jiong, Sang Zixia |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/09/e3sconf_iaecst20_01015.pdf |
Similar Items
-
Study on process evaluation and early warning technology of 35 kV and above power grid infrastructure project
by: Gao Qian, et al.
Published: (2020-01-01) -
Exploration on Prediction and Early Warning Technology for Investment Completion of 10 kV And Below Power Grid Infrastructure Projects
by: Ma Lei, et al.
Published: (2020-01-01) -
Configuration management of electricity distribution grids 6-35 kV according to the criteria of reliability
by: Vukolov Vladimir, et al.
Published: (2018-01-01) -
Analysis of application effect of 220 kV UPFC demonstration project in Shanghai grid
by: Yong Cui, et al.
Published: (2019-04-01) -
Research on Investment Structure of Voltage Level Supporting High Quality Development
by: Lu Shengwei, et al.
Published: (2020-01-01)