Study on the application of shutdown factors to investment management of 35 kV and above power grid infrastructure projects

With the strengthening of external supervision and the management requirements of internal quality and efficiency improvement of power grid, it is particularly important to improve the lean level of power grid investment. However, the accuracy and scientificity of the current grid infrastructure pro...

Full description

Bibliographic Details
Main Authors: Zhou Ming, Lu Shengwei, Wu Qiang, Jin Sha, Yan Jiong, Sang Zixia
Format: Article
Language:English
Published: EDP Sciences 2021-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/09/e3sconf_iaecst20_01015.pdf
id doaj-f3f1d3d0c056402bbd9ddcd94528f7ae
record_format Article
spelling doaj-f3f1d3d0c056402bbd9ddcd94528f7ae2021-02-01T08:06:18ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012330101510.1051/e3sconf/202123301015e3sconf_iaecst20_01015Study on the application of shutdown factors to investment management of 35 kV and above power grid infrastructure projectsZhou Ming0Lu Shengwei1Wu Qiang2Jin Sha3Yan Jiong4Sang Zixia5State Grid Hubei Electric Power Co., LtdState Grid Hubei Electric Power Co., LtdState Grid Hubei Electric Power Co., LtdState Grid Hubei Electric Power Co., LtdHubei Economic Research Institute of State Grid Hubei Electric Power Co., LtdHubei Economic Research Institute of State Grid Hubei Electric Power Co., LtdWith the strengthening of external supervision and the management requirements of internal quality and efficiency improvement of power grid, it is particularly important to improve the lean level of power grid investment. However, the accuracy and scientificity of the current grid infrastructure project investment plan adjustment need to be further improved, and the basis for the completion of investment submission is the on-site construction progress. Therefore, this topic carries out the analysis of the factors affecting the construction progress, including the types of the factors affecting the construction, the depth and breadth of the impact, and the impact of the milestone stage, and takes the analysis results of the shutdown factors as the reference basis for the adjustment of the investment plan, so as to improve the investment management level of the company.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/09/e3sconf_iaecst20_01015.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Zhou Ming
Lu Shengwei
Wu Qiang
Jin Sha
Yan Jiong
Sang Zixia
spellingShingle Zhou Ming
Lu Shengwei
Wu Qiang
Jin Sha
Yan Jiong
Sang Zixia
Study on the application of shutdown factors to investment management of 35 kV and above power grid infrastructure projects
E3S Web of Conferences
author_facet Zhou Ming
Lu Shengwei
Wu Qiang
Jin Sha
Yan Jiong
Sang Zixia
author_sort Zhou Ming
title Study on the application of shutdown factors to investment management of 35 kV and above power grid infrastructure projects
title_short Study on the application of shutdown factors to investment management of 35 kV and above power grid infrastructure projects
title_full Study on the application of shutdown factors to investment management of 35 kV and above power grid infrastructure projects
title_fullStr Study on the application of shutdown factors to investment management of 35 kV and above power grid infrastructure projects
title_full_unstemmed Study on the application of shutdown factors to investment management of 35 kV and above power grid infrastructure projects
title_sort study on the application of shutdown factors to investment management of 35 kv and above power grid infrastructure projects
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2021-01-01
description With the strengthening of external supervision and the management requirements of internal quality and efficiency improvement of power grid, it is particularly important to improve the lean level of power grid investment. However, the accuracy and scientificity of the current grid infrastructure project investment plan adjustment need to be further improved, and the basis for the completion of investment submission is the on-site construction progress. Therefore, this topic carries out the analysis of the factors affecting the construction progress, including the types of the factors affecting the construction, the depth and breadth of the impact, and the impact of the milestone stage, and takes the analysis results of the shutdown factors as the reference basis for the adjustment of the investment plan, so as to improve the investment management level of the company.
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/09/e3sconf_iaecst20_01015.pdf
work_keys_str_mv AT zhouming studyontheapplicationofshutdownfactorstoinvestmentmanagementof35kvandabovepowergridinfrastructureprojects
AT lushengwei studyontheapplicationofshutdownfactorstoinvestmentmanagementof35kvandabovepowergridinfrastructureprojects
AT wuqiang studyontheapplicationofshutdownfactorstoinvestmentmanagementof35kvandabovepowergridinfrastructureprojects
AT jinsha studyontheapplicationofshutdownfactorstoinvestmentmanagementof35kvandabovepowergridinfrastructureprojects
AT yanjiong studyontheapplicationofshutdownfactorstoinvestmentmanagementof35kvandabovepowergridinfrastructureprojects
AT sangzixia studyontheapplicationofshutdownfactorstoinvestmentmanagementof35kvandabovepowergridinfrastructureprojects
_version_ 1724315605807398912