FORECASTING OF SHIP’S CONSTRUCTION COST BY USING THE METHOD OF THE FUZZY SETS THEORY

In order to take a rational decision about construction of a ship it is necessary to have an adequate predictive estimate of a construction cost. Traditional forecasting methods do not provide the required level of reliability of a shipyard’s cost estimates. The method of cost forecasting based on f...

Full description

Bibliographic Details
Main Authors: M. Y. Alekhin, V. V. Raev
Format: Article
Language:Russian
Published: Real Economics Publishing House 2014-10-01
Series: Strategičeskie Rešeniâ i Risk-Menedžment
Subjects:
Online Access:https://www.jsdrm.ru/jour/article/view/110
id doaj-f3d0c4a62b054936955fbcae66be088e
record_format Article
spelling doaj-f3d0c4a62b054936955fbcae66be088e2020-11-25T03:48:28ZrusReal Economics Publishing House Strategičeskie Rešeniâ i Risk-Menedžment2618-947X2618-99842014-10-0102748010.17747/2078-8886-2012-2-74-80124FORECASTING OF SHIP’S CONSTRUCTION COST BY USING THE METHOD OF THE FUZZY SETS THEORYM. Y. Alekhin0V. V. Raev1St. Petersburg State Marine Technical UniversitySt. Petersburg State Marine Technical UniversityIn order to take a rational decision about construction of a ship it is necessary to have an adequate predictive estimate of a construction cost. Traditional forecasting methods do not provide the required level of reliability of a shipyard’s cost estimates. The method of cost forecasting based on fuzzy logic system is proposed. This method has several advantages, including: use of fuzzy initial information for forecasting; increase of the result’s validity due to the potential of use all relevant information for forecasting. In view of the aforesaid it increases the validity of management decisions and has a positive impact on the overall economic sustainability of an enterprise.https://www.jsdrm.ru/jour/article/view/110fuzzy logiccost forecastingconstruction cost of a shipshipbuilding
collection DOAJ
language Russian
format Article
sources DOAJ
author M. Y. Alekhin
V. V. Raev
spellingShingle M. Y. Alekhin
V. V. Raev
FORECASTING OF SHIP’S CONSTRUCTION COST BY USING THE METHOD OF THE FUZZY SETS THEORY
Strategičeskie Rešeniâ i Risk-Menedžment
fuzzy logic
cost forecasting
construction cost of a ship
shipbuilding
author_facet M. Y. Alekhin
V. V. Raev
author_sort M. Y. Alekhin
title FORECASTING OF SHIP’S CONSTRUCTION COST BY USING THE METHOD OF THE FUZZY SETS THEORY
title_short FORECASTING OF SHIP’S CONSTRUCTION COST BY USING THE METHOD OF THE FUZZY SETS THEORY
title_full FORECASTING OF SHIP’S CONSTRUCTION COST BY USING THE METHOD OF THE FUZZY SETS THEORY
title_fullStr FORECASTING OF SHIP’S CONSTRUCTION COST BY USING THE METHOD OF THE FUZZY SETS THEORY
title_full_unstemmed FORECASTING OF SHIP’S CONSTRUCTION COST BY USING THE METHOD OF THE FUZZY SETS THEORY
title_sort forecasting of ship’s construction cost by using the method of the fuzzy sets theory
publisher Real Economics Publishing House
series Strategičeskie Rešeniâ i Risk-Menedžment
issn 2618-947X
2618-9984
publishDate 2014-10-01
description In order to take a rational decision about construction of a ship it is necessary to have an adequate predictive estimate of a construction cost. Traditional forecasting methods do not provide the required level of reliability of a shipyard’s cost estimates. The method of cost forecasting based on fuzzy logic system is proposed. This method has several advantages, including: use of fuzzy initial information for forecasting; increase of the result’s validity due to the potential of use all relevant information for forecasting. In view of the aforesaid it increases the validity of management decisions and has a positive impact on the overall economic sustainability of an enterprise.
topic fuzzy logic
cost forecasting
construction cost of a ship
shipbuilding
url https://www.jsdrm.ru/jour/article/view/110
work_keys_str_mv AT myalekhin forecastingofshipsconstructioncostbyusingthemethodofthefuzzysetstheory
AT vvraev forecastingofshipsconstructioncostbyusingthemethodofthefuzzysetstheory
_version_ 1715113684636794880