SISTEM PENDUKUNG KEPUTUSAN PENERIMAAN PESANAN MENGGUNAKAN LOAD ORIENTED MANUFACTURING CONTROL (LOMC)

CV. Grafika Inndah is a printing company, majoring in job order production system. While so far, the company has problems on the decision making due to lead time for booking orders that the company can accept customer orders according to quantity and due date. The production process of the design,...

Full description

Bibliographic Details
Main Authors: Deni Pandwinata, Annie Purwani, Agung Kristanto
Format: Article
Language:English
Published: Muhammadiyah University Press 2013-06-01
Series:Jurnal Ilmiah Teknik Industri
Subjects:
Online Access:http://journals.ums.ac.id/index.php/jiti/article/view/664/403
id doaj-f38c44a573204e339acc8d18de10224d
record_format Article
spelling doaj-f38c44a573204e339acc8d18de10224d2020-11-24T23:44:55ZengMuhammadiyah University PressJurnal Ilmiah Teknik Industri1412-68692460-40382013-06-0112196110SISTEM PENDUKUNG KEPUTUSAN PENERIMAAN PESANAN MENGGUNAKAN LOAD ORIENTED MANUFACTURING CONTROL (LOMC)Deni Pandwinata0Annie Purwani1Agung Kristanto2 Jurusan Teknik Industri, Universitas Ahmad Dahlan (UAD) Yogyakarta Jurusan Teknik Industri, Universitas Ahmad Dahlan (UAD) Yogyakarta Jurusan Teknik Industri, Universitas Ahmad Dahlan (UAD) YogyakartaCV. Grafika Inndah is a printing company, majoring in job order production system. While so far, the company has problems on the decision making due to lead time for booking orders that the company can accept customer orders according to quantity and due date. The production process of the design, print finishing and that includes the print engine 52 and engine Sakura print shop. The station receives a print job that exceeds the load capacity. Thus this research aims to determine the lead time, the average output and average utility. Data processing in this study using the method of manufacturing systems based load control (load oriented manufacturing control), and to assist in decision-making applications built using Delphi. Programming of the analysis of the data processing method known LOMC can the average lead time work station 2.88 hours and an average of 99.7% utilities, and Print Shop Lead time average of 1.82 hours and an average of 99.85% utilities. Decision support system applied in this study deserves to be implemented. It can be seen from the test program using the Black Box Test and Alpha Test is evidenced in respondents answered SS (strongly agree) as much as 48% and S (agree) as much as 46% .http://journals.ums.ac.id/index.php/jiti/article/view/664/403Load Oriented Manufaktur ControlLead timeUtilitasDecision Support System
collection DOAJ
language English
format Article
sources DOAJ
author Deni Pandwinata
Annie Purwani
Agung Kristanto
spellingShingle Deni Pandwinata
Annie Purwani
Agung Kristanto
SISTEM PENDUKUNG KEPUTUSAN PENERIMAAN PESANAN MENGGUNAKAN LOAD ORIENTED MANUFACTURING CONTROL (LOMC)
Jurnal Ilmiah Teknik Industri
Load Oriented Manufaktur Control
Lead time
Utilitas
Decision Support System
author_facet Deni Pandwinata
Annie Purwani
Agung Kristanto
author_sort Deni Pandwinata
title SISTEM PENDUKUNG KEPUTUSAN PENERIMAAN PESANAN MENGGUNAKAN LOAD ORIENTED MANUFACTURING CONTROL (LOMC)
title_short SISTEM PENDUKUNG KEPUTUSAN PENERIMAAN PESANAN MENGGUNAKAN LOAD ORIENTED MANUFACTURING CONTROL (LOMC)
title_full SISTEM PENDUKUNG KEPUTUSAN PENERIMAAN PESANAN MENGGUNAKAN LOAD ORIENTED MANUFACTURING CONTROL (LOMC)
title_fullStr SISTEM PENDUKUNG KEPUTUSAN PENERIMAAN PESANAN MENGGUNAKAN LOAD ORIENTED MANUFACTURING CONTROL (LOMC)
title_full_unstemmed SISTEM PENDUKUNG KEPUTUSAN PENERIMAAN PESANAN MENGGUNAKAN LOAD ORIENTED MANUFACTURING CONTROL (LOMC)
title_sort sistem pendukung keputusan penerimaan pesanan menggunakan load oriented manufacturing control (lomc)
publisher Muhammadiyah University Press
series Jurnal Ilmiah Teknik Industri
issn 1412-6869
2460-4038
publishDate 2013-06-01
description CV. Grafika Inndah is a printing company, majoring in job order production system. While so far, the company has problems on the decision making due to lead time for booking orders that the company can accept customer orders according to quantity and due date. The production process of the design, print finishing and that includes the print engine 52 and engine Sakura print shop. The station receives a print job that exceeds the load capacity. Thus this research aims to determine the lead time, the average output and average utility. Data processing in this study using the method of manufacturing systems based load control (load oriented manufacturing control), and to assist in decision-making applications built using Delphi. Programming of the analysis of the data processing method known LOMC can the average lead time work station 2.88 hours and an average of 99.7% utilities, and Print Shop Lead time average of 1.82 hours and an average of 99.85% utilities. Decision support system applied in this study deserves to be implemented. It can be seen from the test program using the Black Box Test and Alpha Test is evidenced in respondents answered SS (strongly agree) as much as 48% and S (agree) as much as 46% .
topic Load Oriented Manufaktur Control
Lead time
Utilitas
Decision Support System
url http://journals.ums.ac.id/index.php/jiti/article/view/664/403
work_keys_str_mv AT denipandwinata sistempendukungkeputusanpenerimaanpesananmenggunakanloadorientedmanufacturingcontrollomc
AT anniepurwani sistempendukungkeputusanpenerimaanpesananmenggunakanloadorientedmanufacturingcontrollomc
AT agungkristanto sistempendukungkeputusanpenerimaanpesananmenggunakanloadorientedmanufacturingcontrollomc
_version_ 1725497982280794112