Ambidextrous learning of engineering project team: Relying on control or BIM AI VR AR MR?

Through formal control and social control, technology platforms can acquire the information knowledge needed for ambidextrous learning of engineering project team, but whether technology platforms influence ambidextrous learning of engineering project team through the intermediary role of ambidextro...

Full description

Bibliographic Details
Main Authors: Suying Yang, Guiyun Cui, Shaokai Lu
Format: Article
Language:English
Published: SAGE Publishing 2020-08-01
Series:International Journal of Engineering Business Management
Online Access:https://doi.org/10.1177/1847979020948749
id doaj-f205f6b2f8d1413084fa1873b438f964
record_format Article
spelling doaj-f205f6b2f8d1413084fa1873b438f9642021-04-02T11:37:22ZengSAGE PublishingInternational Journal of Engineering Business Management1847-97902020-08-011210.1177/1847979020948749Ambidextrous learning of engineering project team: Relying on control or BIM AI VR AR MR?Suying Yang0Guiyun Cui1Shaokai Lu2 The School of Economics and Management, , Chengdu, China , Ltd., Xi’an Shaanxi, China The School of Economics and Management, , Chengdu, ChinaThrough formal control and social control, technology platforms can acquire the information knowledge needed for ambidextrous learning of engineering project team, but whether technology platforms influence ambidextrous learning of engineering project team through the intermediary role of ambidextrous control (formal control, social control) is still lack of theoretical and empirical support. In order to explore the influence of the co-use of technology platform and ambidextrous control on the ambidextrous learning of engineering project team, this paper constructs a theoretical framework between the performance of ambidextrous control (formal control, social control) and different types of technology platform (BIM, AI, VR, AR, MR) and different types of learning (exploratory learning, exploitative learning). A questionnaire survey was conducted among 210 project managers. AMOS22.0 and bootstrap software were used for analysis and test, SPSS22.0 was used for hierarchical regression analysis, the results of hierarchical regression analysis show that formal control, social control and the balanced use of both have significant positive correlation with the ambidextrous learning and balanced use of ambidextrous learning of engineering project team. Formal Information Technology Platform (BIM) and Informal Information Technology Platform (AI, VR, AR, MR) have significant positive effects on the ambidextrous learning of engineering project team. The balanced use of formal Information Technology Platform (BIM) and informal Information Technology Platform (AI, AR) has significant positive effects on the ambidextrous learning balance of engineering project team. Formal control and social control mediate the positive correlation between information technology platform (BIM, AI, VR, AR, MR) and ambidextrous learning of engineering project team. In addition, information technology platform (BIM, AI, VR) regulates the impact of formal control and social control on learning (exploratory learning, exploitative learning). Generally speaking, different types of technology platforms and ambidextrous control strategies are still effective for the ambidextrous learning and balance of engineering project team.https://doi.org/10.1177/1847979020948749
collection DOAJ
language English
format Article
sources DOAJ
author Suying Yang
Guiyun Cui
Shaokai Lu
spellingShingle Suying Yang
Guiyun Cui
Shaokai Lu
Ambidextrous learning of engineering project team: Relying on control or BIM AI VR AR MR?
International Journal of Engineering Business Management
author_facet Suying Yang
Guiyun Cui
Shaokai Lu
author_sort Suying Yang
title Ambidextrous learning of engineering project team: Relying on control or BIM AI VR AR MR?
title_short Ambidextrous learning of engineering project team: Relying on control or BIM AI VR AR MR?
title_full Ambidextrous learning of engineering project team: Relying on control or BIM AI VR AR MR?
title_fullStr Ambidextrous learning of engineering project team: Relying on control or BIM AI VR AR MR?
title_full_unstemmed Ambidextrous learning of engineering project team: Relying on control or BIM AI VR AR MR?
title_sort ambidextrous learning of engineering project team: relying on control or bim ai vr ar mr?
publisher SAGE Publishing
series International Journal of Engineering Business Management
issn 1847-9790
publishDate 2020-08-01
description Through formal control and social control, technology platforms can acquire the information knowledge needed for ambidextrous learning of engineering project team, but whether technology platforms influence ambidextrous learning of engineering project team through the intermediary role of ambidextrous control (formal control, social control) is still lack of theoretical and empirical support. In order to explore the influence of the co-use of technology platform and ambidextrous control on the ambidextrous learning of engineering project team, this paper constructs a theoretical framework between the performance of ambidextrous control (formal control, social control) and different types of technology platform (BIM, AI, VR, AR, MR) and different types of learning (exploratory learning, exploitative learning). A questionnaire survey was conducted among 210 project managers. AMOS22.0 and bootstrap software were used for analysis and test, SPSS22.0 was used for hierarchical regression analysis, the results of hierarchical regression analysis show that formal control, social control and the balanced use of both have significant positive correlation with the ambidextrous learning and balanced use of ambidextrous learning of engineering project team. Formal Information Technology Platform (BIM) and Informal Information Technology Platform (AI, VR, AR, MR) have significant positive effects on the ambidextrous learning of engineering project team. The balanced use of formal Information Technology Platform (BIM) and informal Information Technology Platform (AI, AR) has significant positive effects on the ambidextrous learning balance of engineering project team. Formal control and social control mediate the positive correlation between information technology platform (BIM, AI, VR, AR, MR) and ambidextrous learning of engineering project team. In addition, information technology platform (BIM, AI, VR) regulates the impact of formal control and social control on learning (exploratory learning, exploitative learning). Generally speaking, different types of technology platforms and ambidextrous control strategies are still effective for the ambidextrous learning and balance of engineering project team.
url https://doi.org/10.1177/1847979020948749
work_keys_str_mv AT suyingyang ambidextrouslearningofengineeringprojectteamrelyingoncontrolorbimaivrarmr
AT guiyuncui ambidextrouslearningofengineeringprojectteamrelyingoncontrolorbimaivrarmr
AT shaokailu ambidextrouslearningofengineeringprojectteamrelyingoncontrolorbimaivrarmr
_version_ 1724164317690986496