Short-Term Scheduling of Expected Output-Sensitive Cascaded Hydro Systems Considering the Provision of Reserve Services
The integration of large-scale wind and solar power into the power grid brings new challenges to the security and stability of power systems because of the uncertainty and intermittence of wind and solar power. This sensitive expected output has real implications for short-term hydro scheduling (STH...
Main Authors: | Ruhong Zhong, Chuntian Cheng, Shengli Liao, Zhipeng Zhao |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2020-05-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/13/10/2477 |
Similar Items
-
Peak Shaving Model for Coordinated Hydro-Wind-Solar System Serving Local and Multiple Receiving Power Grids via HVDC Transmission Lines
by: Benxi Liu, et al.
Published: (2020-01-01) -
A Short-Term Optimal Scheduling Model for Wind-Solar-Hydro Hybrid Generation System With Cascade Hydropower Considering Regulation Reserve and Spinning Reserve Requirements
by: Jun Xie, et al.
Published: (2021-01-01) -
Dimensioning Studies for Reversible Hydro Power Plants in Portuguese Islands
by: Nuno Fonseca, et al.
Published: (2018-04-01) -
HP SolarTech AB : PeakShaving
by: Wennström, Vincent, et al.
Published: (2021) -
Research on Peak-shaving Problem of Receiving Power System with Nuclear Power Under Wind Power Grid Connection
by: LU Siyu, et al.
Published: (2021-03-01)