Modeling and Analysis of Ground Settlement Between a Flyover and Reinforced Soil Embankment
Development of the transport infrastructure in Poland has contributed to the implementation of various technologies of construction of bridges and their components. Use of reinforced soil for construction of embankments, retaining structures (RSS walls) and abutments is one of the solutions which ha...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2018-12-01
|
Series: | Archives of Civil Engineering |
Subjects: | |
Online Access: | http://www.degruyter.com/view/j/ace.2018.64.issue-4/ace-2018-0064/ace-2018-0064.xml?format=INT |
id |
doaj-f1ba133a38a746848bb566a5f35ff436 |
---|---|
record_format |
Article |
spelling |
doaj-f1ba133a38a746848bb566a5f35ff4362020-11-25T01:58:26ZengSciendoArchives of Civil Engineering1230-29452018-12-016447710010.2478/ace-2018-0064ace-2018-0064Modeling and Analysis of Ground Settlement Between a Flyover and Reinforced Soil EmbankmentBukowski M.0Łysiak P.1Oleszek R.2Trochymiak W.3PhD., Eng., Warsaw University of Technology, Faculty of Civil Engineering, ul. Lecha Kaczyńskiego 16, 00-637 Warsaw, PolandMSc., Eng., Budimex S.A., ul. Stawki 40, 01-040 Warsaw, PolandMSc., Eng., Warsaw University of Technology, Faculty of Civil Engineering, ul. Lecha Kaczyńskiego 16, 00-637 Warsaw, PolandDSc., PhD., Eng., Warsaw University of Technology, Faculty of Civil Engineering, ul. Lecha Kaczyńskiego 16, 00-637 Warsaw, PolandDevelopment of the transport infrastructure in Poland has contributed to the implementation of various technologies of construction of bridges and their components. Use of reinforced soil for construction of embankments, retaining structures (RSS walls) and abutments is one of the solutions which has been frequently used for the past twenty years. Shortly after its development, the technology proposed by Henri Vidal in 1966 also gained appreciation in Poland [4]. Reinforced soil bridge abutments started to be widely used in Poland at the turn of the 20th century. The bridge facilities at the junction of Trasa Siekierkowska route and Wał Miedzeszyński Street in Warsaw, which were built in the years 2000÷2002, are an example of structures from that period. The authors of this paper have been particularly interested in the outermost supports of the reinforced concrete flyovers which were constructed in the form of intermediate reinforced soil abutments. Offsets – the vertical displacements, in the range of 15÷25mm, emerging between the level of the road surface and the steel elements of the expansion joints which separate the flyover’s structure from the embankment – were observed in 2015, in the course of regular inspections. While accounting for the observations which have been made, the surveying measurements and the ground investigation, the paper diagnoses and describes the mechanism which led to the emergence of the offsets. Potential patterns of the occurrence of additional settlements, as the reason for emergence of the offsets, were identified and analyzed. The settlement of the outermost support (abutment), as a result of increase of relative density of alluvial sands due to the dynamic interaction of the roadways of Wał Miedzeszyński Street, was analyzed. Analytical and numeric approaches were used in the course of analysis while relying on PLAXIS and MIDAS software.http://www.degruyter.com/view/j/ace.2018.64.issue-4/ace-2018-0064/ace-2018-0064.xml?format=INTflyoversreinforced soil bridge abutmentssettlementoffset |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Bukowski M. Łysiak P. Oleszek R. Trochymiak W. |
spellingShingle |
Bukowski M. Łysiak P. Oleszek R. Trochymiak W. Modeling and Analysis of Ground Settlement Between a Flyover and Reinforced Soil Embankment Archives of Civil Engineering flyovers reinforced soil bridge abutments settlement offset |
author_facet |
Bukowski M. Łysiak P. Oleszek R. Trochymiak W. |
author_sort |
Bukowski M. |
title |
Modeling and Analysis of Ground Settlement Between a Flyover and Reinforced Soil Embankment |
title_short |
Modeling and Analysis of Ground Settlement Between a Flyover and Reinforced Soil Embankment |
title_full |
Modeling and Analysis of Ground Settlement Between a Flyover and Reinforced Soil Embankment |
title_fullStr |
Modeling and Analysis of Ground Settlement Between a Flyover and Reinforced Soil Embankment |
title_full_unstemmed |
Modeling and Analysis of Ground Settlement Between a Flyover and Reinforced Soil Embankment |
title_sort |
modeling and analysis of ground settlement between a flyover and reinforced soil embankment |
publisher |
Sciendo |
series |
Archives of Civil Engineering |
issn |
1230-2945 |
publishDate |
2018-12-01 |
description |
Development of the transport infrastructure in Poland has contributed to the implementation of various technologies of construction of bridges and their components. Use of reinforced soil for construction of embankments, retaining structures (RSS walls) and abutments is one of the solutions which has been frequently used for the past twenty years. Shortly after its development, the technology proposed by Henri Vidal in 1966 also gained appreciation in Poland [4]. Reinforced soil bridge abutments started to be widely used in Poland at the turn of the 20th century. The bridge facilities at the junction of Trasa Siekierkowska route and Wał Miedzeszyński Street in Warsaw, which were built in the years 2000÷2002, are an example of structures from that period. The authors of this paper have been particularly interested in the outermost supports of the reinforced concrete flyovers which were constructed in the form of intermediate reinforced soil abutments. Offsets – the vertical displacements, in the range of 15÷25mm, emerging between the level of the road surface and the steel elements of the expansion joints which separate the flyover’s structure from the embankment – were observed in 2015, in the course of regular inspections. While accounting for the observations which have been made, the surveying measurements and the ground investigation, the paper diagnoses and describes the mechanism which led to the emergence of the offsets. Potential patterns of the occurrence of additional settlements, as the reason for emergence of the offsets, were identified and analyzed. The settlement of the outermost support (abutment), as a result of increase of relative density of alluvial sands due to the dynamic interaction of the roadways of Wał Miedzeszyński Street, was analyzed. Analytical and numeric approaches were used in the course of analysis while relying on PLAXIS and MIDAS software. |
topic |
flyovers reinforced soil bridge abutments settlement offset |
url |
http://www.degruyter.com/view/j/ace.2018.64.issue-4/ace-2018-0064/ace-2018-0064.xml?format=INT |
work_keys_str_mv |
AT bukowskim modelingandanalysisofgroundsettlementbetweenaflyoverandreinforcedsoilembankment AT łysiakp modelingandanalysisofgroundsettlementbetweenaflyoverandreinforcedsoilembankment AT oleszekr modelingandanalysisofgroundsettlementbetweenaflyoverandreinforcedsoilembankment AT trochymiakw modelingandanalysisofgroundsettlementbetweenaflyoverandreinforcedsoilembankment |
_version_ |
1724969695980814336 |