An integrated approach of sustainable procurement and procurement postponement for the multi-product, assemble-to-order (ATO) production system

Abstract Postponement strategy is mainly used to handle the perceived variety and actual variety of product in the most cost effective way. However, postponement strategy has never been used by researchers in procurement to reduce cost and to enhance overall flexibility of the process. This paper gi...

Full description

Bibliographic Details
Main Author: Krishnendu Mukherjee
Format: Article
Language:English
Published: Associação Brasileira de Engenharia de Produção (ABEPRO) 2016-06-01
Series:Production
Subjects:
AHP
Online Access:http://www.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132016000200249&lng=en&tlng=en
id doaj-f1ac79f1da844886844f91541629dd64
record_format Article
spelling doaj-f1ac79f1da844886844f91541629dd642020-11-24T22:46:20ZengAssociação Brasileira de Engenharia de Produção (ABEPRO)Production1980-54112016-06-0126224926010.1590/0103-6513.191915S0103-65132016000200249An integrated approach of sustainable procurement and procurement postponement for the multi-product, assemble-to-order (ATO) production systemKrishnendu MukherjeeAbstract Postponement strategy is mainly used to handle the perceived variety and actual variety of product in the most cost effective way. However, postponement strategy has never been used by researchers in procurement to reduce cost and to enhance overall flexibility of the process. This paper gives a new concept of postponement, called procurement postponement, which is considered to be effective for the multi-product, assemble-to-order (ATO) system. A two-stage integrated approach of sustainable procurement and postponement method is proposed for the multi-product ATO production system to deal demand uncertainty, green house gas (GHG) emission, reliability of supply, level of disassembly and social issues of supplier selection with intuitionsitic fuzzy analytic hierarchy (IF-AHP) and multi-objective genetic algorithm (MOGA). Case study of an Indian company is discussed to use the proposed method by cost-emission-decision matrix.http://www.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132016000200249&lng=en&tlng=enIntuitionsitic fuzzy setAHPMOGACost-emission-decision matrixPostponement strategy
collection DOAJ
language English
format Article
sources DOAJ
author Krishnendu Mukherjee
spellingShingle Krishnendu Mukherjee
An integrated approach of sustainable procurement and procurement postponement for the multi-product, assemble-to-order (ATO) production system
Production
Intuitionsitic fuzzy set
AHP
MOGA
Cost-emission-decision matrix
Postponement strategy
author_facet Krishnendu Mukherjee
author_sort Krishnendu Mukherjee
title An integrated approach of sustainable procurement and procurement postponement for the multi-product, assemble-to-order (ATO) production system
title_short An integrated approach of sustainable procurement and procurement postponement for the multi-product, assemble-to-order (ATO) production system
title_full An integrated approach of sustainable procurement and procurement postponement for the multi-product, assemble-to-order (ATO) production system
title_fullStr An integrated approach of sustainable procurement and procurement postponement for the multi-product, assemble-to-order (ATO) production system
title_full_unstemmed An integrated approach of sustainable procurement and procurement postponement for the multi-product, assemble-to-order (ATO) production system
title_sort integrated approach of sustainable procurement and procurement postponement for the multi-product, assemble-to-order (ato) production system
publisher Associação Brasileira de Engenharia de Produção (ABEPRO)
series Production
issn 1980-5411
publishDate 2016-06-01
description Abstract Postponement strategy is mainly used to handle the perceived variety and actual variety of product in the most cost effective way. However, postponement strategy has never been used by researchers in procurement to reduce cost and to enhance overall flexibility of the process. This paper gives a new concept of postponement, called procurement postponement, which is considered to be effective for the multi-product, assemble-to-order (ATO) system. A two-stage integrated approach of sustainable procurement and postponement method is proposed for the multi-product ATO production system to deal demand uncertainty, green house gas (GHG) emission, reliability of supply, level of disassembly and social issues of supplier selection with intuitionsitic fuzzy analytic hierarchy (IF-AHP) and multi-objective genetic algorithm (MOGA). Case study of an Indian company is discussed to use the proposed method by cost-emission-decision matrix.
topic Intuitionsitic fuzzy set
AHP
MOGA
Cost-emission-decision matrix
Postponement strategy
url http://www.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132016000200249&lng=en&tlng=en
work_keys_str_mv AT krishnendumukherjee anintegratedapproachofsustainableprocurementandprocurementpostponementforthemultiproductassembletoorderatoproductionsystem
AT krishnendumukherjee integratedapproachofsustainableprocurementandprocurementpostponementforthemultiproductassembletoorderatoproductionsystem
_version_ 1725685192088092672