Optimasi Sudut Ujung Pipa Penangkapan Gas Metana Pada Metode Arrow System
Drilling system on a pile of waste to get the methane gas is very difficult because the majority of waste that is made from plastic so it can get caught in the drill. Manual excavation is not allowed because it is very dangerous, while digging with heavy equipment has not been able to do because it...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
2012-02-01
|
Series: | Jurnal Teknik Industri |
Subjects: | |
Online Access: | http://ejournal.umm.ac.id/index.php/industri/article/view/533 |
id |
doaj-f158ad64131446b5a158e36c31b8e854 |
---|---|
record_format |
Article |
spelling |
doaj-f158ad64131446b5a158e36c31b8e8542020-11-25T01:29:38ZengJurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah MalangJurnal Teknik Industri 1978-14312527-41122012-02-0112214114610.22219/JTIUMM.Vol12.No2.141-146578Optimasi Sudut Ujung Pipa Penangkapan Gas Metana Pada Metode Arrow SystemZamzami SeptiropaAchmad Fauzan H.SMoch. ZainuddinDrilling system on a pile of waste to get the methane gas is very difficult because the majority of waste that is made from plastic so it can get caught in the drill. Manual excavation is not allowed because it is very dangerous, while digging with heavy equipment has not been able to do because it requires a special tool that is able to push and pull waste surface. Making holes with arrow system method that is larger arrowhead from the arrow shaft, is one alternative that can be tried to get a hole / gas extraction wells at the Landfill Supit Urang - Malang. Results hole larger than the arrow shaft is then filled with gravels as well extration methane in the landfill. The force required pile (arrow system) to the pole with pole diameter 26.7 cm and a maximum depth of 5.20 m (at point 1, the arrows point of 30˚ and 45˚) is a row of 63,087 kg and 79,717 kg . Optimum angle in terms of penetration force needs is the pole with arrowhead angle 30˚.http://ejournal.umm.ac.id/index.php/industri/article/view/533Methane gas, Pile Foundation, Arrow System |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Zamzami Septiropa Achmad Fauzan H.S Moch. Zainuddin |
spellingShingle |
Zamzami Septiropa Achmad Fauzan H.S Moch. Zainuddin Optimasi Sudut Ujung Pipa Penangkapan Gas Metana Pada Metode Arrow System Jurnal Teknik Industri Methane gas, Pile Foundation, Arrow System |
author_facet |
Zamzami Septiropa Achmad Fauzan H.S Moch. Zainuddin |
author_sort |
Zamzami Septiropa |
title |
Optimasi Sudut Ujung Pipa Penangkapan Gas Metana Pada Metode Arrow System |
title_short |
Optimasi Sudut Ujung Pipa Penangkapan Gas Metana Pada Metode Arrow System |
title_full |
Optimasi Sudut Ujung Pipa Penangkapan Gas Metana Pada Metode Arrow System |
title_fullStr |
Optimasi Sudut Ujung Pipa Penangkapan Gas Metana Pada Metode Arrow System |
title_full_unstemmed |
Optimasi Sudut Ujung Pipa Penangkapan Gas Metana Pada Metode Arrow System |
title_sort |
optimasi sudut ujung pipa penangkapan gas metana pada metode arrow system |
publisher |
Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang |
series |
Jurnal Teknik Industri |
issn |
1978-1431 2527-4112 |
publishDate |
2012-02-01 |
description |
Drilling system on a pile of waste to get the methane gas is very difficult because the majority of waste that is made from plastic so it can get caught in the drill. Manual excavation
is not allowed because it is very dangerous, while digging with heavy equipment has not been able to do because it requires a special tool that is able to push and pull waste surface. Making
holes with arrow system method that is larger arrowhead from the arrow shaft, is one alternative that can be tried to get a hole / gas extraction wells at the Landfill Supit Urang - Malang.
Results hole larger than the arrow shaft is then filled with gravels as well extration methane in the landfill. The force required pile (arrow system) to the pole with pole diameter 26.7 cm and a maximum depth of 5.20 m (at point 1, the arrows point of 30˚ and 45˚) is a row of 63,087 kg and 79,717 kg . Optimum angle in terms of penetration force needs is the pole with arrowhead angle 30˚. |
topic |
Methane gas, Pile Foundation, Arrow System |
url |
http://ejournal.umm.ac.id/index.php/industri/article/view/533 |
work_keys_str_mv |
AT zamzamiseptiropa optimasisudutujungpipapenangkapangasmetanapadametodearrowsystem AT achmadfauzanhs optimasisudutujungpipapenangkapangasmetanapadametodearrowsystem AT mochzainuddin optimasisudutujungpipapenangkapangasmetanapadametodearrowsystem |
_version_ |
1725095918152187904 |