Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China
In this study, the reasonable construction sequence of an overlapping tunnel shield is investigated. Taking the overlapping tunnel of Tianjin Metro Line 5 as the background, a three-dimensional numerical model was established using Flac3D software to study the influence of the “first up and then dow...
Main Authors: | , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/4909750 |
id |
doaj-f0e60cc9ee9b45a4be2fd63e24213adc |
---|---|
record_format |
Article |
spelling |
doaj-f0e60cc9ee9b45a4be2fd63e24213adc2020-11-25T03:02:11ZengHindawi LimitedAdvances in Civil Engineering1687-80861687-80942020-01-01202010.1155/2020/49097504909750Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in ChinaZhiyong Yang0Yaowen Ding1Yusheng Jiang2Kuanda Fang3Linwei Dong4Weiqiang Qi5Zheng Wei6School of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaIn this study, the reasonable construction sequence of an overlapping tunnel shield is investigated. Taking the overlapping tunnel of Tianjin Metro Line 5 as the background, a three-dimensional numerical model was established using Flac3D software to study the influence of the “first up and then down” and “first down and then up” construction sequences of the overlapping tunnel on the surface settlement, stratum displacement, lining radial stress, and displacement. The research results show that the shape and width of the final settlement tank on the ground under the two conditions are basically the same, and the difference between the maximum cumulative settlements is small. The accumulated ground settlement caused by the first up and then down construction sequence is 1.8 mm larger than that caused by the first down and then up sequence. The difference between the two working conditions on the vertical displacement of the stratum mainly occurs in the middle stratum of the upper and lower tunnels, and the proportion of the strata in the uplifted state and subsidence state is different. The construction sequence has little effect on the radial stress on the lining of the upper and lower tunnels. Under these two conditions, the excavation of the second tunnel causes a small change in the radial stress of the preceding tunnel lining, both within 4.2%. Under the working condition of first down and then up, the construction of the second tunnel causes the lining of the preceding tunnel to rise by 7.2∼9.2 mm. Under the condition of first up and then down, the construction of the second tunnel causes the lining of the preceding tunnel to sink again by 9.1∼10.4 mm. By comparing the effects of the two working conditions on the stratum and the tunnel lining, it is recommended that the construction be carried out in the order of first down and then up.http://dx.doi.org/10.1155/2020/4909750 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Zhiyong Yang Yaowen Ding Yusheng Jiang Kuanda Fang Linwei Dong Weiqiang Qi Zheng Wei |
spellingShingle |
Zhiyong Yang Yaowen Ding Yusheng Jiang Kuanda Fang Linwei Dong Weiqiang Qi Zheng Wei Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China Advances in Civil Engineering |
author_facet |
Zhiyong Yang Yaowen Ding Yusheng Jiang Kuanda Fang Linwei Dong Weiqiang Qi Zheng Wei |
author_sort |
Zhiyong Yang |
title |
Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China |
title_short |
Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China |
title_full |
Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China |
title_fullStr |
Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China |
title_full_unstemmed |
Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China |
title_sort |
study of the construction sequence of overlapping tunnels by the shield tunneling method: a case study of the longest overlapping tunnel in china |
publisher |
Hindawi Limited |
series |
Advances in Civil Engineering |
issn |
1687-8086 1687-8094 |
publishDate |
2020-01-01 |
description |
In this study, the reasonable construction sequence of an overlapping tunnel shield is investigated. Taking the overlapping tunnel of Tianjin Metro Line 5 as the background, a three-dimensional numerical model was established using Flac3D software to study the influence of the “first up and then down” and “first down and then up” construction sequences of the overlapping tunnel on the surface settlement, stratum displacement, lining radial stress, and displacement. The research results show that the shape and width of the final settlement tank on the ground under the two conditions are basically the same, and the difference between the maximum cumulative settlements is small. The accumulated ground settlement caused by the first up and then down construction sequence is 1.8 mm larger than that caused by the first down and then up sequence. The difference between the two working conditions on the vertical displacement of the stratum mainly occurs in the middle stratum of the upper and lower tunnels, and the proportion of the strata in the uplifted state and subsidence state is different. The construction sequence has little effect on the radial stress on the lining of the upper and lower tunnels. Under these two conditions, the excavation of the second tunnel causes a small change in the radial stress of the preceding tunnel lining, both within 4.2%. Under the working condition of first down and then up, the construction of the second tunnel causes the lining of the preceding tunnel to rise by 7.2∼9.2 mm. Under the condition of first up and then down, the construction of the second tunnel causes the lining of the preceding tunnel to sink again by 9.1∼10.4 mm. By comparing the effects of the two working conditions on the stratum and the tunnel lining, it is recommended that the construction be carried out in the order of first down and then up. |
url |
http://dx.doi.org/10.1155/2020/4909750 |
work_keys_str_mv |
AT zhiyongyang studyoftheconstructionsequenceofoverlappingtunnelsbytheshieldtunnelingmethodacasestudyofthelongestoverlappingtunnelinchina AT yaowending studyoftheconstructionsequenceofoverlappingtunnelsbytheshieldtunnelingmethodacasestudyofthelongestoverlappingtunnelinchina AT yushengjiang studyoftheconstructionsequenceofoverlappingtunnelsbytheshieldtunnelingmethodacasestudyofthelongestoverlappingtunnelinchina AT kuandafang studyoftheconstructionsequenceofoverlappingtunnelsbytheshieldtunnelingmethodacasestudyofthelongestoverlappingtunnelinchina AT linweidong studyoftheconstructionsequenceofoverlappingtunnelsbytheshieldtunnelingmethodacasestudyofthelongestoverlappingtunnelinchina AT weiqiangqi studyoftheconstructionsequenceofoverlappingtunnelsbytheshieldtunnelingmethodacasestudyofthelongestoverlappingtunnelinchina AT zhengwei studyoftheconstructionsequenceofoverlappingtunnelsbytheshieldtunnelingmethodacasestudyofthelongestoverlappingtunnelinchina |