Master Installation Design And Transformer Need Analysis in Faculty of Engineering Udayana University Denpasar

Faculty of Engineering, Udayana University, PB. Sudirman Denpasar has 5 building units (buildings A, B, C, D, AF). Currently the AF building is undergoing renovation and is planned to be on 4 floors. The entire building will be equipped with the installation of 2 elevator units. The construction of...

Full description

Bibliographic Details
Main Authors: IGN Janardana, Wayan Arta Wijaya
Format: Article
Language:English
Published: Universitas Udayana 2020-05-01
Series:Journal of Electrical, Electronics and Informatics
Online Access:https://ojs.unud.ac.id/index.php/JEEI/article/view/56358
id doaj-f0ced15c93674453aa651405ff66585a
record_format Article
spelling doaj-f0ced15c93674453aa651405ff66585a2020-11-25T03:17:33ZengUniversitas UdayanaJournal of Electrical, Electronics and Informatics2549-83042622-03932020-05-0141303310.24843/JEEI.2020.v04.i01.p0556358Master Installation Design And Transformer Need Analysis in Faculty of Engineering Udayana University DenpasarIGN Janardana0Wayan Arta Wijayaudayana universityFaculty of Engineering, Udayana University, PB. Sudirman Denpasar has 5 building units (buildings A, B, C, D, AF). Currently the AF building is undergoing renovation and is planned to be on 4 floors. The entire building will be equipped with the installation of 2 elevator units. The construction of the two new buildings and the installation of the 2 elevator units caused new problems of electricity shortages, changes in safety settings, unbalanced loads, and changes in the size of the main cable and the needs of the transformer and its capacity. The AF building and building A are supplied from sources on the transformer which are joined with other faculties, while Buildings B, C, D and E are fed by one transformer No. 124303818 with a capacity of 160 kVA. The plan to build an Alumni Building does not yet have electricity. Based on the analysis of the design, the total amount of power needed in all buildings in the Sudirman Denpasar Faculty of Engineering is the result of the AF Building planning = 134,280 watts, the Alumni Building planning results (building area and building functions are considered equal = 134,280 watts), so the total needs power to the two buildings = 271 560 Watt with a load deviation of 65%, then 0.65 x 271 560 W = 176 514 Watt. Then the total power requirement of the entire building is 259,340 watts. The measurement result of Cos ? 0.92, then P (kVA) = 281,891,3043 Ampere = 281,8913 kVA. So that the transformer needs that must be prepared by the Faculty of Engineering to meet the power requirements at the Faculty of Engineering, Udayana University Denpasar with 80% transformer efficiency is a 350 kVA transformer with a placement position around the Faculty of Engineering areahttps://ojs.unud.ac.id/index.php/JEEI/article/view/56358
collection DOAJ
language English
format Article
sources DOAJ
author IGN Janardana
Wayan Arta Wijaya
spellingShingle IGN Janardana
Wayan Arta Wijaya
Master Installation Design And Transformer Need Analysis in Faculty of Engineering Udayana University Denpasar
Journal of Electrical, Electronics and Informatics
author_facet IGN Janardana
Wayan Arta Wijaya
author_sort IGN Janardana
title Master Installation Design And Transformer Need Analysis in Faculty of Engineering Udayana University Denpasar
title_short Master Installation Design And Transformer Need Analysis in Faculty of Engineering Udayana University Denpasar
title_full Master Installation Design And Transformer Need Analysis in Faculty of Engineering Udayana University Denpasar
title_fullStr Master Installation Design And Transformer Need Analysis in Faculty of Engineering Udayana University Denpasar
title_full_unstemmed Master Installation Design And Transformer Need Analysis in Faculty of Engineering Udayana University Denpasar
title_sort master installation design and transformer need analysis in faculty of engineering udayana university denpasar
publisher Universitas Udayana
series Journal of Electrical, Electronics and Informatics
issn 2549-8304
2622-0393
publishDate 2020-05-01
description Faculty of Engineering, Udayana University, PB. Sudirman Denpasar has 5 building units (buildings A, B, C, D, AF). Currently the AF building is undergoing renovation and is planned to be on 4 floors. The entire building will be equipped with the installation of 2 elevator units. The construction of the two new buildings and the installation of the 2 elevator units caused new problems of electricity shortages, changes in safety settings, unbalanced loads, and changes in the size of the main cable and the needs of the transformer and its capacity. The AF building and building A are supplied from sources on the transformer which are joined with other faculties, while Buildings B, C, D and E are fed by one transformer No. 124303818 with a capacity of 160 kVA. The plan to build an Alumni Building does not yet have electricity. Based on the analysis of the design, the total amount of power needed in all buildings in the Sudirman Denpasar Faculty of Engineering is the result of the AF Building planning = 134,280 watts, the Alumni Building planning results (building area and building functions are considered equal = 134,280 watts), so the total needs power to the two buildings = 271 560 Watt with a load deviation of 65%, then 0.65 x 271 560 W = 176 514 Watt. Then the total power requirement of the entire building is 259,340 watts. The measurement result of Cos ? 0.92, then P (kVA) = 281,891,3043 Ampere = 281,8913 kVA. So that the transformer needs that must be prepared by the Faculty of Engineering to meet the power requirements at the Faculty of Engineering, Udayana University Denpasar with 80% transformer efficiency is a 350 kVA transformer with a placement position around the Faculty of Engineering area
url https://ojs.unud.ac.id/index.php/JEEI/article/view/56358
work_keys_str_mv AT ignjanardana masterinstallationdesignandtransformerneedanalysisinfacultyofengineeringudayanauniversitydenpasar
AT wayanartawijaya masterinstallationdesignandtransformerneedanalysisinfacultyofengineeringudayanauniversitydenpasar
_version_ 1724631551845597184