ANALISIS BEBAN KERJA UNTUK MENENTUKAN JUMLAH KARYAWAN OPTIMAL PADA BAGIAN OPERASI SARANA PENYELENGGARAAN DIKLAT KILANG PPSDM MIGAS
PPSDM Migas is a company engaged in oil and gas. One factor that must be considered by the company is the distribution of workload to employees so that the effectiveness and efficiency of employees can be reach. The fact in the field, PPSDM Migas has just transferred its employees to PPSDM Jakarta...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Industrial Engineering Department Faculty of Industrial Technology Universitas Ahmad Dahlan
2019-04-01
|
Series: | Spektrum Industri: Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri |
Subjects: | |
Online Access: | http://journal.uad.ac.id/index.php/Spektrum/article/view/8369 |
Summary: | PPSDM Migas is a company engaged in oil and gas. One factor that must be considered by the company
is the distribution of workload to employees so that the effectiveness and efficiency of employees can be
reach. The fact in the field, PPSDM Migas has just transferred its employees to PPSDM Jakarta, so there
is a discrepancy between workload and number of employees. To overcome the problem of measuring
workloads in PPSDM Migas, this study uses a task per task approach. This method will provide
information about the allocation of employee human resources to complete the existing workload
optimally. Based on the results of the workload measurement on PPSDM Migas using the task per task
approach it can be concluded that from the two positions as a pilot project there was one position which
resulted in a mismatch between the workload and the number of office holders, namely 4 Tank employees
and Distribution but from the calculation results it takes 7 employees. The position of Executor of
Distillation Operations has the number of employees as many as 2 employees and from the results of the
calculation required 2 employees, this shows the suitability between the number of employees and the
workload on the position. Based on the results of calculations from both positions, the position of
Implementing Distillation Operations is included in the category of sufficient office efficiency. Whereas in
the position of Implementing Tank and Distribution Installation get the medium category. |
---|---|
ISSN: | 1693-6590 2442-2630 |