Influential Factors in Estimating and Tendering for Construction Work
Cost estimation, bid/no bid decision, estimating accuracy, and cost overrun are the four main cost estimating issues (MCEI) investigated by many previous researchers from different parts of the world for decades. Factors relating to client characteristics, consultant and design parameters, contracto...
Main Authors: | Choon Toh Tien, Sim Lim Cheng, Connie Ting, Nita Ali Kherun, Uche Aliagha Godwin, Chen Goh Kai |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2016-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | http://dx.doi.org/10.1051/matecconf/20164704007 |
Similar Items
-
A review of potential areas of construction cost estimating and identification of research gaps
by: Toh, Tien Choon, et al.
Published: (2008) -
Effects of perceptions on BIM adoption in Malaysian construction industry
by: Enegbuma, Wallace Imoudu, et al.
Published: (2015) -
The influence of transformational leadership style on ICT adoption in the Nigerian construction industry
by: Waziri, Abdullahi Y., et al.
Published: (2015) -
Environment variables on IT adoption: a case of Nigerian construction organizations
by: Waziri, Abdullahi Y., et al.
Published: (2015) -
Analysis of shopping mall attractiveness and customer loyalty
by: Aliagha, Godwin Uche, et al.
Published: (2015)