Influential Factors in Estimating and Tendering for Construction Work
Cost estimation, bid/no bid decision, estimating accuracy, and cost overrun are the four main cost estimating issues (MCEI) investigated by many previous researchers from different parts of the world for decades. Factors relating to client characteristics, consultant and design parameters, contracto...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2016-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | http://dx.doi.org/10.1051/matecconf/20164704007 |
id |
doaj-efe2f2793ab94215b44af7369180d8af |
---|---|
record_format |
Article |
spelling |
doaj-efe2f2793ab94215b44af7369180d8af2021-02-02T00:54:25ZengEDP SciencesMATEC Web of Conferences2261-236X2016-01-01470400710.1051/matecconf/20164704007matecconf_iconcees2016_04007Influential Factors in Estimating and Tendering for Construction WorkChoon Toh Tien0Sim Lim Cheng1Connie Ting2Nita Ali Kherun3Uche Aliagha Godwin4Chen Goh Kai5Department of Surveying, Lee Kong Chian Faculty of Engineering and Science, Universiti Tunku Abdul RahmanDepartment of Surveying, Lee Kong Chian Faculty of Engineering and Science, Universiti Tunku Abdul RahmanAsia Pacific Logistics Center, Eppendorf Asia Pacific Sdn BhdDepartment of Quantity Surveying, Faculty of Built Environment, Universiti Teknologi MalaysiaDepartment of Real Estate, Faculty of Geoinformation and Real Estate, Universiti Teknologi MalaysiaDepartment of Construction Management, Faculty of Technology Management and Business, Universiti Tun Hussein Onn MalaysiaCost estimation, bid/no bid decision, estimating accuracy, and cost overrun are the four main cost estimating issues (MCEI) investigated by many previous researchers from different parts of the world for decades. Factors relating to client characteristics, consultant and design parameters, contractor attributes, project characteristics, contract procedures and procurement methods, and external market conditions [1] are examined for their influences on those four MCEI separately. However, very little attention is paid on the comparison of factors rankings across those four MCEI. Results from comparing those factors rankings improve the understandings on cost estimating issues. Thus, this study aims to compare the factors rankings across the four MCEI and evaluate the degree of agreement between the four sets of ranks for their influential factors. Four previous studies, each examining factors affecting each of the four MCEI are selected through literature survey for analysis. Influential factors from each previous study are assigned to their related categories: client, consultant, contractor, project, contract, and environment. Kendall’s coefficient of concordance is used to assess interjudge reliability. The computed correlation indicates a moderate degree of association between the four sets of ranks. It is found that the four MCEI are influenced by different factors with different ranks and hence should be treated as different MCEI and be managed differently.http://dx.doi.org/10.1051/matecconf/20164704007 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Choon Toh Tien Sim Lim Cheng Connie Ting Nita Ali Kherun Uche Aliagha Godwin Chen Goh Kai |
spellingShingle |
Choon Toh Tien Sim Lim Cheng Connie Ting Nita Ali Kherun Uche Aliagha Godwin Chen Goh Kai Influential Factors in Estimating and Tendering for Construction Work MATEC Web of Conferences |
author_facet |
Choon Toh Tien Sim Lim Cheng Connie Ting Nita Ali Kherun Uche Aliagha Godwin Chen Goh Kai |
author_sort |
Choon Toh Tien |
title |
Influential Factors in Estimating and Tendering for Construction Work |
title_short |
Influential Factors in Estimating and Tendering for Construction Work |
title_full |
Influential Factors in Estimating and Tendering for Construction Work |
title_fullStr |
Influential Factors in Estimating and Tendering for Construction Work |
title_full_unstemmed |
Influential Factors in Estimating and Tendering for Construction Work |
title_sort |
influential factors in estimating and tendering for construction work |
publisher |
EDP Sciences |
series |
MATEC Web of Conferences |
issn |
2261-236X |
publishDate |
2016-01-01 |
description |
Cost estimation, bid/no bid decision, estimating accuracy, and cost overrun are the four main cost estimating issues (MCEI) investigated by many previous researchers from different parts of the world for decades. Factors relating to client characteristics, consultant and design parameters, contractor attributes, project characteristics, contract procedures and procurement methods, and external market conditions [1] are examined for their influences on those four MCEI separately. However, very little attention is paid on the comparison of factors rankings across those four MCEI. Results from comparing those factors rankings improve the understandings on cost estimating issues. Thus, this study aims to compare the factors rankings across the four MCEI and evaluate the degree of agreement between the four sets of ranks for their influential factors. Four previous studies, each examining factors affecting each of the four MCEI are selected through literature survey for analysis. Influential factors from each previous study are assigned to their related categories: client, consultant, contractor, project, contract, and environment. Kendall’s coefficient of concordance is used to assess interjudge reliability. The computed correlation indicates a moderate degree of association between the four sets of ranks. It is found that the four MCEI are influenced by different factors with different ranks and hence should be treated as different MCEI and be managed differently. |
url |
http://dx.doi.org/10.1051/matecconf/20164704007 |
work_keys_str_mv |
AT choontohtien influentialfactorsinestimatingandtenderingforconstructionwork AT simlimcheng influentialfactorsinestimatingandtenderingforconstructionwork AT connieting influentialfactorsinestimatingandtenderingforconstructionwork AT nitaalikherun influentialfactorsinestimatingandtenderingforconstructionwork AT uchealiaghagodwin influentialfactorsinestimatingandtenderingforconstructionwork AT chengohkai influentialfactorsinestimatingandtenderingforconstructionwork |
_version_ |
1724312769462796288 |