Status quo and development potential of full life cycle evaluation of construction waste

It is critically important to synthesize the life-cycle assessment (LCA) and construction waste content, especially in term in recycling of construction waste resources[1] and optimizing critria in the lifecycle evaluation. That is, the development of construction waste resources is entitled to be b...

Full description

Bibliographic Details
Main Authors: Jia Jingming, Ren Fumin, Zhu Jintong
Format: Article
Language:English
Published: EDP Sciences 2021-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/13/e3sconf_arfee2021_01035.pdf
Description
Summary:It is critically important to synthesize the life-cycle assessment (LCA) and construction waste content, especially in term in recycling of construction waste resources[1] and optimizing critria in the lifecycle evaluation. That is, the development of construction waste resources is entitled to be boosted, as same as criteria and elements in periodic evaluation concentrating on the module of construction waste. This paper analyzes the disadvantages of construction waste and potential promotion in each stage, which is of great significance for improving the evaluation system and management of construction waste.
ISSN:2267-1242