How to determine the time needed to dry the drainage layer of airdrome pavement
In order to further improve the normative basis of airdrome pavement projecting for increasing it efficiency considered is the problem of determining the time needed to dry the drainage layer, its capacity and hydraulic slope and to obtain the best economic results. Here we give the results which ca...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
National Aviation University
1998-01-01
|
Series: | Vìsnik Nacìonalʹnogo Avìacìjnogo Unìversitetu |
Online Access: | http://jrnl.nau.edu.ua/index.php/visnik/article/view/10998 |