Controllable Processing Times in Project and Production Management: Analysing the Trade-Off between Processing Times and the Amount of Resources
The amount of resources assigned to a task highly influences its processing time. Traditionally, different functions have been used in the literature in order to map the processing time of the task with the amount of resources assigned to the task. Obviously, this relation depends on several factors...
Main Authors: | Victor Fernandez-Viagas, Jose M. Framinan |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2015-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2015/826318 |
Similar Items
-
Integrated Project Scheduling and Staff Assignment with Controllable Processing Times
by: Victor Fernandez-Viagas, et al.
Published: (2014-01-01) -
Discrete Time/cost Trade-off Problem In Project Scheduling
by: Hafizoglu, Ahmet Baykal
Published: (2007) -
Time, Cost and Safety Trade-off Analysis of Project Compression
by: Wei-MinChiu, et al.
Published: (2015) -
Time variability management and trade-off analysis of quality, productivity, and maintenance efficiency
by: João Thiago de Guimarães Anchieta e Araujo Campos, et al.
Published: (2021-04-01) -
Resource and performance trade-offs in real-time embedded control systems
by: Lozoya Gámez, Rafael Camilo
Published: (2011)