Comparing the planning and performance of direct labour and design-bid-build construction projects in Nigeria / Planavimo ir veiklos efektyvumo palyginimas, Nigerijos statybų projektuose naudojant tiesioginį darbą ir taikant tradicinį pirkimų metodą
This study compares the levels of planning and the outcome of projects procured by direct labour and traditional contract procurement options. For this comparison, a survey of 130 projects was carried out. Data were collected using structured questionnaires and analysed using percentage, mean and...
Main Author: | Godwin Iroroakpo Idoro |
---|---|
Format: | Article |
Language: | English |
Published: |
Vilnius Gediminas Technical University
2012-04-01
|
Series: | Journal of Civil Engineering and Management |
Subjects: | |
Online Access: | http://journals.vgtu.lt/index.php/JCEM/article/view/4439 |
Similar Items
-
Sustainability of mechanisation in the nigerian construction industry / Mechanizacijos tvarumas nigerijos statybų sektoriuje
by: Godwin Iroroakpo Idoro
Published: (2012-02-01) -
Health and safety management efforts as correlates of performance in the Nigerian construction industry/Sveikatos ir saugos darbe valdymo pastangos nigerijos statybų pramonėje
by: Godwin Iroroakpo Idoro
Published: (2008-12-01) -
Vilniaus ikimokyklinių įstaigų dalyvavimas tarptautiniuose projektuose: patirtis ir problemos
by: Tamaševičiūtė, Renata
Published: (2007) -
Mokytojų motyvavimas dalyvauti projektuose: prielaidos ir galimybės
by: Baltakys, Virgilijus
Published: (2007) -
Dokumentų analizė ir palyginimas naudojant ontologijas
by: Kurklietytė, Gita
Published: (2009)