Effect of Subway Excavation with Different Support Pressures on Existing Utility Tunnel in Xi’an Loess

The interaction between two shield tunnels and the integrated pipe corridor is complicated and still lacks understanding. This paper investigated the influence of the double-track subway construction on the deformation characteristics of the existing comprehensive pipe corridor based on numerical si...

Full description

Bibliographic Details
Main Authors: Min Yang, Hongru Li, Ning Li, Shun Yang
Format: Article
Language:English
Published: Hindawi Limited 2020-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2020/8818949
id doaj-ec5462a9f40946d58cae759a708e7399
record_format Article
spelling doaj-ec5462a9f40946d58cae759a708e73992020-11-25T03:29:04ZengHindawi LimitedAdvances in Civil Engineering1687-80861687-80942020-01-01202010.1155/2020/88189498818949Effect of Subway Excavation with Different Support Pressures on Existing Utility Tunnel in Xi’an LoessMin Yang0Hongru Li1Ning Li2Shun Yang3Institute of Geotechnical Engineering, Xi’an University of Technology, Xi’an, ChinaInstitute of Geotechnical Engineering, Xi’an University of Technology, Xi’an, ChinaInstitute of Geotechnical Engineering, Xi’an University of Technology, Xi’an, ChinaInstitute of Geotechnical Engineering, Xi’an University of Technology, Xi’an, ChinaThe interaction between two shield tunnels and the integrated pipe corridor is complicated and still lacks understanding. This paper investigated the influence of the double-track subway construction on the deformation characteristics of the existing comprehensive pipe corridor based on numerical simulation on a case history in Xi’an, China. First, loess is a special kind of clayed soil. In the theoretical calculation of overburden earth pressure of shield tunnel, the loose earth pressure theory under the incomplete soil arching effect can be used for calculation when considering the soil arching effect. Then, in the loess area of Xi’an, the existing comprehensive pipe corridor is affected by the construction disturbance. The vertical displacement of the existing pipe corridor utility tunnel affected by different support pressures which considers the soil arch effect or not was extracted from the FEM. The results indicated that, in the case where the left and right lines are constructed at different times, the vertical displacement of the pipe gallery is affected by different support pressures. If the support pressure is small, the settlement will be large, and the uplift will be diminutive. According to the construction methods and supporting pressures of this article, shield tunnel construction will not damage the safety of the comprehensive pipe corridor.http://dx.doi.org/10.1155/2020/8818949
collection DOAJ
language English
format Article
sources DOAJ
author Min Yang
Hongru Li
Ning Li
Shun Yang
spellingShingle Min Yang
Hongru Li
Ning Li
Shun Yang
Effect of Subway Excavation with Different Support Pressures on Existing Utility Tunnel in Xi’an Loess
Advances in Civil Engineering
author_facet Min Yang
Hongru Li
Ning Li
Shun Yang
author_sort Min Yang
title Effect of Subway Excavation with Different Support Pressures on Existing Utility Tunnel in Xi’an Loess
title_short Effect of Subway Excavation with Different Support Pressures on Existing Utility Tunnel in Xi’an Loess
title_full Effect of Subway Excavation with Different Support Pressures on Existing Utility Tunnel in Xi’an Loess
title_fullStr Effect of Subway Excavation with Different Support Pressures on Existing Utility Tunnel in Xi’an Loess
title_full_unstemmed Effect of Subway Excavation with Different Support Pressures on Existing Utility Tunnel in Xi’an Loess
title_sort effect of subway excavation with different support pressures on existing utility tunnel in xi’an loess
publisher Hindawi Limited
series Advances in Civil Engineering
issn 1687-8086
1687-8094
publishDate 2020-01-01
description The interaction between two shield tunnels and the integrated pipe corridor is complicated and still lacks understanding. This paper investigated the influence of the double-track subway construction on the deformation characteristics of the existing comprehensive pipe corridor based on numerical simulation on a case history in Xi’an, China. First, loess is a special kind of clayed soil. In the theoretical calculation of overburden earth pressure of shield tunnel, the loose earth pressure theory under the incomplete soil arching effect can be used for calculation when considering the soil arching effect. Then, in the loess area of Xi’an, the existing comprehensive pipe corridor is affected by the construction disturbance. The vertical displacement of the existing pipe corridor utility tunnel affected by different support pressures which considers the soil arch effect or not was extracted from the FEM. The results indicated that, in the case where the left and right lines are constructed at different times, the vertical displacement of the pipe gallery is affected by different support pressures. If the support pressure is small, the settlement will be large, and the uplift will be diminutive. According to the construction methods and supporting pressures of this article, shield tunnel construction will not damage the safety of the comprehensive pipe corridor.
url http://dx.doi.org/10.1155/2020/8818949
work_keys_str_mv AT minyang effectofsubwayexcavationwithdifferentsupportpressuresonexistingutilitytunnelinxianloess
AT hongruli effectofsubwayexcavationwithdifferentsupportpressuresonexistingutilitytunnelinxianloess
AT ningli effectofsubwayexcavationwithdifferentsupportpressuresonexistingutilitytunnelinxianloess
AT shunyang effectofsubwayexcavationwithdifferentsupportpressuresonexistingutilitytunnelinxianloess
_version_ 1715201559891017728