Interconnection of influent channel and pumping station units
This paper reports on the results obtained the priority recommended strategy for carrying out reconstructive work aimed of the reliability control and safety of Jizzakh main pumping station. It has been established that the safe operation level of Jizzakh main pumping station is supported under the...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/23/e3sconf_form2018_05011.pdf |
id |
doaj-eae4373415bb42b092bb23ffcea69069 |
---|---|
record_format |
Article |
spelling |
doaj-eae4373415bb42b092bb23ffcea690692021-02-02T07:55:22ZengEDP SciencesE3S Web of Conferences2267-12422019-01-01970501110.1051/e3sconf/20199705011e3sconf_form2018_05011Interconnection of influent channel and pumping station unitsGlovatskiy OlegDjavburiyev TemurUrazmukhamedova ZiyodaGazaryan A.Akhmadov FarkhodThis paper reports on the results obtained the priority recommended strategy for carrying out reconstructive work aimed of the reliability control and safety of Jizzakh main pumping station. It has been established that the safe operation level of Jizzakh main pumping station is supported under the following conditions: The watermark in the pump station forebay are not lower than 314.55 and watermark in the headpond is not higher than 337.80 and not lower than 336.90 for the main units. At the station, no more than 5 “main” and 2 “subsidiary” units work, one “main” unit must be constantly in reserve.https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/23/e3sconf_form2018_05011.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Glovatskiy Oleg Djavburiyev Temur Urazmukhamedova Ziyoda Gazaryan A. Akhmadov Farkhod |
spellingShingle |
Glovatskiy Oleg Djavburiyev Temur Urazmukhamedova Ziyoda Gazaryan A. Akhmadov Farkhod Interconnection of influent channel and pumping station units E3S Web of Conferences |
author_facet |
Glovatskiy Oleg Djavburiyev Temur Urazmukhamedova Ziyoda Gazaryan A. Akhmadov Farkhod |
author_sort |
Glovatskiy Oleg |
title |
Interconnection of influent channel and pumping station units |
title_short |
Interconnection of influent channel and pumping station units |
title_full |
Interconnection of influent channel and pumping station units |
title_fullStr |
Interconnection of influent channel and pumping station units |
title_full_unstemmed |
Interconnection of influent channel and pumping station units |
title_sort |
interconnection of influent channel and pumping station units |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2019-01-01 |
description |
This paper reports on the results obtained the priority recommended strategy for carrying out reconstructive work aimed of the reliability control and safety of Jizzakh main pumping station. It has been established that the safe operation level of Jizzakh main pumping station is supported under the following conditions: The watermark in the pump station forebay are not lower than 314.55 and watermark in the headpond is not higher than 337.80 and not lower than 336.90 for the main units. At the station, no more than 5 “main” and 2 “subsidiary” units work, one “main” unit must be constantly in reserve. |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/23/e3sconf_form2018_05011.pdf |
work_keys_str_mv |
AT glovatskiyoleg interconnectionofinfluentchannelandpumpingstationunits AT djavburiyevtemur interconnectionofinfluentchannelandpumpingstationunits AT urazmukhamedovaziyoda interconnectionofinfluentchannelandpumpingstationunits AT gazaryana interconnectionofinfluentchannelandpumpingstationunits AT akhmadovfarkhod interconnectionofinfluentchannelandpumpingstationunits |
_version_ |
1724298355047137280 |