Interconnection of influent channel and pumping station units

This paper reports on the results obtained the priority recommended strategy for carrying out reconstructive work aimed of the reliability control and safety of Jizzakh main pumping station. It has been established that the safe operation level of Jizzakh main pumping station is supported under the...

Full description

Bibliographic Details
Main Authors: Glovatskiy Oleg, Djavburiyev Temur, Urazmukhamedova Ziyoda, Gazaryan A., Akhmadov Farkhod
Format: Article
Language:English
Published: EDP Sciences 2019-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/23/e3sconf_form2018_05011.pdf
id doaj-eae4373415bb42b092bb23ffcea69069
record_format Article
spelling doaj-eae4373415bb42b092bb23ffcea690692021-02-02T07:55:22ZengEDP SciencesE3S Web of Conferences2267-12422019-01-01970501110.1051/e3sconf/20199705011e3sconf_form2018_05011Interconnection of influent channel and pumping station unitsGlovatskiy OlegDjavburiyev TemurUrazmukhamedova ZiyodaGazaryan A.Akhmadov FarkhodThis paper reports on the results obtained the priority recommended strategy for carrying out reconstructive work aimed of the reliability control and safety of Jizzakh main pumping station. It has been established that the safe operation level of Jizzakh main pumping station is supported under the following conditions: The watermark in the pump station forebay are not lower than 314.55 and watermark in the headpond is not higher than 337.80 and not lower than 336.90 for the main units. At the station, no more than 5 “main” and 2 “subsidiary” units work, one “main” unit must be constantly in reserve.https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/23/e3sconf_form2018_05011.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Glovatskiy Oleg
Djavburiyev Temur
Urazmukhamedova Ziyoda
Gazaryan A.
Akhmadov Farkhod
spellingShingle Glovatskiy Oleg
Djavburiyev Temur
Urazmukhamedova Ziyoda
Gazaryan A.
Akhmadov Farkhod
Interconnection of influent channel and pumping station units
E3S Web of Conferences
author_facet Glovatskiy Oleg
Djavburiyev Temur
Urazmukhamedova Ziyoda
Gazaryan A.
Akhmadov Farkhod
author_sort Glovatskiy Oleg
title Interconnection of influent channel and pumping station units
title_short Interconnection of influent channel and pumping station units
title_full Interconnection of influent channel and pumping station units
title_fullStr Interconnection of influent channel and pumping station units
title_full_unstemmed Interconnection of influent channel and pumping station units
title_sort interconnection of influent channel and pumping station units
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2019-01-01
description This paper reports on the results obtained the priority recommended strategy for carrying out reconstructive work aimed of the reliability control and safety of Jizzakh main pumping station. It has been established that the safe operation level of Jizzakh main pumping station is supported under the following conditions: The watermark in the pump station forebay are not lower than 314.55 and watermark in the headpond is not higher than 337.80 and not lower than 336.90 for the main units. At the station, no more than 5 “main” and 2 “subsidiary” units work, one “main” unit must be constantly in reserve.
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/23/e3sconf_form2018_05011.pdf
work_keys_str_mv AT glovatskiyoleg interconnectionofinfluentchannelandpumpingstationunits
AT djavburiyevtemur interconnectionofinfluentchannelandpumpingstationunits
AT urazmukhamedovaziyoda interconnectionofinfluentchannelandpumpingstationunits
AT gazaryana interconnectionofinfluentchannelandpumpingstationunits
AT akhmadovfarkhod interconnectionofinfluentchannelandpumpingstationunits
_version_ 1724298355047137280