Heuristic approach for risk assessment modeling: EPCCM application (Engineer Procure Construct Contract Management)

Various risk factors influence construction projects cost and schedule performance from project conception to completion. In the context of project management contract assessment helps allocate integrated risks. The aim of this thesis is to investigate standard conditions of contract, namely FIDIC,...

Full description

Bibliographic Details
Main Authors: Ali F. Bakr, Khaled El Hagla, Ayda Nayer Abo Rawash
Format: Article
Language:English
Published: Elsevier 2012-12-01
Series:Alexandria Engineering Journal
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S1110016812000609
id doaj-eaa1d8c353af4831add14407803076c1
record_format Article
spelling doaj-eaa1d8c353af4831add14407803076c12021-06-02T10:23:42ZengElsevierAlexandria Engineering Journal1110-01682012-12-0151430532310.1016/j.aej.2012.09.001Heuristic approach for risk assessment modeling: EPCCM application (Engineer Procure Construct Contract Management)Ali F. BakrKhaled El HaglaAyda Nayer Abo RawashVarious risk factors influence construction projects cost and schedule performance from project conception to completion. In the context of project management contract assessment helps allocate integrated risks. The aim of this thesis is to investigate standard conditions of contract, namely FIDIC, Turnkey EPC (Engineer, Procure, Construct) conditions of contracts as a standard contract format. Implications of the contract clauses for the risk management strategy to be adopted by contractors are analyzed through pre defined risk assessment plan RMP. Relevant conditions will be scrutinized in terms of induced risk events. The basis for defining major risk categories and events are described through RBS (Risk Breakdown Structure) schemes, as well as, proposed actions and mitigation plans. Finally, EPCCM; modeling system is created to assist contract administrators, to diminish time, effort, wading back and forth between construction cases and developed projects. The result is a more efficient and proactive contract management environment by providing database for lessons learned in addition to tracking ongoing projects contractual risks, and consequently for issuing relevant decisions and activity plans.http://www.sciencedirect.com/science/article/pii/S1110016812000609Turnkey projectsConstruction contractRisk allocationRisk managementModeling
collection DOAJ
language English
format Article
sources DOAJ
author Ali F. Bakr
Khaled El Hagla
Ayda Nayer Abo Rawash
spellingShingle Ali F. Bakr
Khaled El Hagla
Ayda Nayer Abo Rawash
Heuristic approach for risk assessment modeling: EPCCM application (Engineer Procure Construct Contract Management)
Alexandria Engineering Journal
Turnkey projects
Construction contract
Risk allocation
Risk management
Modeling
author_facet Ali F. Bakr
Khaled El Hagla
Ayda Nayer Abo Rawash
author_sort Ali F. Bakr
title Heuristic approach for risk assessment modeling: EPCCM application (Engineer Procure Construct Contract Management)
title_short Heuristic approach for risk assessment modeling: EPCCM application (Engineer Procure Construct Contract Management)
title_full Heuristic approach for risk assessment modeling: EPCCM application (Engineer Procure Construct Contract Management)
title_fullStr Heuristic approach for risk assessment modeling: EPCCM application (Engineer Procure Construct Contract Management)
title_full_unstemmed Heuristic approach for risk assessment modeling: EPCCM application (Engineer Procure Construct Contract Management)
title_sort heuristic approach for risk assessment modeling: epccm application (engineer procure construct contract management)
publisher Elsevier
series Alexandria Engineering Journal
issn 1110-0168
publishDate 2012-12-01
description Various risk factors influence construction projects cost and schedule performance from project conception to completion. In the context of project management contract assessment helps allocate integrated risks. The aim of this thesis is to investigate standard conditions of contract, namely FIDIC, Turnkey EPC (Engineer, Procure, Construct) conditions of contracts as a standard contract format. Implications of the contract clauses for the risk management strategy to be adopted by contractors are analyzed through pre defined risk assessment plan RMP. Relevant conditions will be scrutinized in terms of induced risk events. The basis for defining major risk categories and events are described through RBS (Risk Breakdown Structure) schemes, as well as, proposed actions and mitigation plans. Finally, EPCCM; modeling system is created to assist contract administrators, to diminish time, effort, wading back and forth between construction cases and developed projects. The result is a more efficient and proactive contract management environment by providing database for lessons learned in addition to tracking ongoing projects contractual risks, and consequently for issuing relevant decisions and activity plans.
topic Turnkey projects
Construction contract
Risk allocation
Risk management
Modeling
url http://www.sciencedirect.com/science/article/pii/S1110016812000609
work_keys_str_mv AT alifbakr heuristicapproachforriskassessmentmodelingepccmapplicationengineerprocureconstructcontractmanagement
AT khaledelhagla heuristicapproachforriskassessmentmodelingepccmapplicationengineerprocureconstructcontractmanagement
AT aydanayeraborawash heuristicapproachforriskassessmentmodelingepccmapplicationengineerprocureconstructcontractmanagement
_version_ 1721405140406108160