Capacity Limitations of brine Contamination on High Density Oil-Based Drilling Fluid

Aimed on the problem that the Drilling fluids were easily intruded by the saline water in high-pressure salt-gypsum formations, and the properties of the drilling fluid were damaged and accidents easily occur. The mechanism of drilling fluid contamination by the formation brine was analyzed and the...

Full description

Bibliographic Details
Main Authors: Li Shuanggui, Fan Sheng, Li Jiaxue, Li Yingting, Qi Biao, Fan Junwei
Format: Article
Language:English
Published: EDP Sciences 2021-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/66/e3sconf_icgec2021_01002.pdf
id doaj-ea4115b0a6964906919ec53c7efa365c
record_format Article
spelling doaj-ea4115b0a6964906919ec53c7efa365c2021-07-15T06:53:49ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012900100210.1051/e3sconf/202129001002e3sconf_icgec2021_01002Capacity Limitations of brine Contamination on High Density Oil-Based Drilling FluidLi ShuangguiFan ShengLi Jiaxue0Li YingtingQi BiaoFan JunweiChina University of Petroleum (Beijing) @ KaramayAimed on the problem that the Drilling fluids were easily intruded by the saline water in high-pressure salt-gypsum formations, and the properties of the drilling fluid were damaged and accidents easily occur. The mechanism of drilling fluid contamination by the formation brine was analyzed and the capacity limits of the contamination were found out. The results show that small amount of brine invasion causes emulsification while large amount of brine invasion lead to demulsification. Two capacity limitations were proposed. The first limitation is 10% of saline water concentration, below which the performance of the drilling fluid remains relatively good. The second limitation is 30% of saline water concentration, below which the drilling fluid needs to be systematically maintained, and after which the fluid has no potential for maintenance. This proposal has been successfully used in 8 wells in Kuqa foreland area, and the drilling cycle was saved by 35 days on average.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/66/e3sconf_icgec2021_01002.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Li Shuanggui
Fan Sheng
Li Jiaxue
Li Yingting
Qi Biao
Fan Junwei
spellingShingle Li Shuanggui
Fan Sheng
Li Jiaxue
Li Yingting
Qi Biao
Fan Junwei
Capacity Limitations of brine Contamination on High Density Oil-Based Drilling Fluid
E3S Web of Conferences
author_facet Li Shuanggui
Fan Sheng
Li Jiaxue
Li Yingting
Qi Biao
Fan Junwei
author_sort Li Shuanggui
title Capacity Limitations of brine Contamination on High Density Oil-Based Drilling Fluid
title_short Capacity Limitations of brine Contamination on High Density Oil-Based Drilling Fluid
title_full Capacity Limitations of brine Contamination on High Density Oil-Based Drilling Fluid
title_fullStr Capacity Limitations of brine Contamination on High Density Oil-Based Drilling Fluid
title_full_unstemmed Capacity Limitations of brine Contamination on High Density Oil-Based Drilling Fluid
title_sort capacity limitations of brine contamination on high density oil-based drilling fluid
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2021-01-01
description Aimed on the problem that the Drilling fluids were easily intruded by the saline water in high-pressure salt-gypsum formations, and the properties of the drilling fluid were damaged and accidents easily occur. The mechanism of drilling fluid contamination by the formation brine was analyzed and the capacity limits of the contamination were found out. The results show that small amount of brine invasion causes emulsification while large amount of brine invasion lead to demulsification. Two capacity limitations were proposed. The first limitation is 10% of saline water concentration, below which the performance of the drilling fluid remains relatively good. The second limitation is 30% of saline water concentration, below which the drilling fluid needs to be systematically maintained, and after which the fluid has no potential for maintenance. This proposal has been successfully used in 8 wells in Kuqa foreland area, and the drilling cycle was saved by 35 days on average.
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/66/e3sconf_icgec2021_01002.pdf
work_keys_str_mv AT lishuanggui capacitylimitationsofbrinecontaminationonhighdensityoilbaseddrillingfluid
AT fansheng capacitylimitationsofbrinecontaminationonhighdensityoilbaseddrillingfluid
AT lijiaxue capacitylimitationsofbrinecontaminationonhighdensityoilbaseddrillingfluid
AT liyingting capacitylimitationsofbrinecontaminationonhighdensityoilbaseddrillingfluid
AT qibiao capacitylimitationsofbrinecontaminationonhighdensityoilbaseddrillingfluid
AT fanjunwei capacitylimitationsofbrinecontaminationonhighdensityoilbaseddrillingfluid
_version_ 1721301710253588480