The latent causes of rework in floating production storage and offloading projects
There is growing demand for cost effective and reliable floating production systems to maximize marginal and new deepwater fields worldwide. Floating Production Storage and Offloading (FPSO) vessels are considered to be the most economical and viable options to meet this demand. Yet, FPSO projects...
Main Authors: | Peter E. D. Love, David John Edwards, Zahir Irani, Nuria Forcada |
---|---|
Format: | Article |
Language: | English |
Published: |
Vilnius Gediminas Technical University
2014-06-01
|
Series: | Journal of Civil Engineering and Management |
Subjects: | |
Online Access: | http://journals.vgtu.lt/index.php/JCEM/article/view/3130 |
Similar Items
-
Making sense of rework and its unintended consequence in projects: the emergence of uncomfortable knowledge
by: Love, P.E.D., et al.
Published: (2019) -
Rework in highway projects
by: Nuria Forcada, et al.
Published: (2014-07-01) -
Analysis of rework causes in infrastructure projects in pulau pinang
by: Dollah, Z., et al.
Published: (2021) -
Creating a mindfulness to learn from errors: Enablers of rework containment and reduction in construction
by: Peter E.D. Love
Published: (2020-02-01) -
Rework Quantification and Influence of Rework on Duration and Cost of Equipment Development Task
by: Xilin Zhang, et al.
Published: (2018-10-01)