Scheduling of the Combined Power and Desalination System

The combined power and desalination system can improve energy utilisation efficiency and market competitiveness of the production process by adjusting production planning according to the demand load of water and electricity. In this paper, the scheduling model is proposed that addresses the operati...

Full description

Bibliographic Details
Main Authors: Lianying Wu, Shengnan Xiao, Yangdong Hu
Format: Article
Language:English
Published: AIDIC Servizi S.r.l. 2020-08-01
Series:Chemical Engineering Transactions
Online Access:https://www.cetjournal.it/index.php/cet/article/view/11142
id doaj-ea395dee517741d7ac75f9481f649506
record_format Article
spelling doaj-ea395dee517741d7ac75f9481f6495062021-02-16T09:26:22ZengAIDIC Servizi S.r.l.Chemical Engineering Transactions2283-92162020-08-018110.3303/CET2081201Scheduling of the Combined Power and Desalination SystemLianying WuShengnan XiaoYangdong HuThe combined power and desalination system can improve energy utilisation efficiency and market competitiveness of the production process by adjusting production planning according to the demand load of water and electricity. In this paper, the scheduling model is proposed that addresses the operational optimisation of the combined power and desalination system. The time-dependent electricity price is considered and the proposed model is described as a nonlinear programming (NLP) problem with the maximising total economic benefits. Based on the periodic characteristics of demand load of water and electricity, the typical day of each season is selected as one scheduling time, which is divided into several time intervals according to the change of electricity price. A case study is adopted to demonstrate the presented scheduling model. The results showed: the multi-stage flash (MSF) system keeps running for the total scheduling cycle and the water production varies between 2,000 t/h and 4,000 t/h. A part group’s module of reverse osmosis (RO) system would be shutdown/start up following the increasing/decreasing demand for electricity. When the electricity price higher, the more electricity is supplied to the users and the less water is produced. While the electricity price lower, less electricity and more water are produced. The surplus water is stored in the tank to make up for high water demand. Comparing with the stand-alone plant, the load fluctuation of the power plant decreases from 150 MW to 20 MW. The operation stability and efficiency will be improved by the optimal scheduling of the combined power and desalination system.https://www.cetjournal.it/index.php/cet/article/view/11142
collection DOAJ
language English
format Article
sources DOAJ
author Lianying Wu
Shengnan Xiao
Yangdong Hu
spellingShingle Lianying Wu
Shengnan Xiao
Yangdong Hu
Scheduling of the Combined Power and Desalination System
Chemical Engineering Transactions
author_facet Lianying Wu
Shengnan Xiao
Yangdong Hu
author_sort Lianying Wu
title Scheduling of the Combined Power and Desalination System
title_short Scheduling of the Combined Power and Desalination System
title_full Scheduling of the Combined Power and Desalination System
title_fullStr Scheduling of the Combined Power and Desalination System
title_full_unstemmed Scheduling of the Combined Power and Desalination System
title_sort scheduling of the combined power and desalination system
publisher AIDIC Servizi S.r.l.
series Chemical Engineering Transactions
issn 2283-9216
publishDate 2020-08-01
description The combined power and desalination system can improve energy utilisation efficiency and market competitiveness of the production process by adjusting production planning according to the demand load of water and electricity. In this paper, the scheduling model is proposed that addresses the operational optimisation of the combined power and desalination system. The time-dependent electricity price is considered and the proposed model is described as a nonlinear programming (NLP) problem with the maximising total economic benefits. Based on the periodic characteristics of demand load of water and electricity, the typical day of each season is selected as one scheduling time, which is divided into several time intervals according to the change of electricity price. A case study is adopted to demonstrate the presented scheduling model. The results showed: the multi-stage flash (MSF) system keeps running for the total scheduling cycle and the water production varies between 2,000 t/h and 4,000 t/h. A part group’s module of reverse osmosis (RO) system would be shutdown/start up following the increasing/decreasing demand for electricity. When the electricity price higher, the more electricity is supplied to the users and the less water is produced. While the electricity price lower, less electricity and more water are produced. The surplus water is stored in the tank to make up for high water demand. Comparing with the stand-alone plant, the load fluctuation of the power plant decreases from 150 MW to 20 MW. The operation stability and efficiency will be improved by the optimal scheduling of the combined power and desalination system.
url https://www.cetjournal.it/index.php/cet/article/view/11142
work_keys_str_mv AT lianyingwu schedulingofthecombinedpoweranddesalinationsystem
AT shengnanxiao schedulingofthecombinedpoweranddesalinationsystem
AT yangdonghu schedulingofthecombinedpoweranddesalinationsystem
_version_ 1724267847867170816