Summary: | The article highlights the unique role of irrigation canals in the supply of water in the required amount, depending on crop demand and the rational use of it. The study of the prevention of filtration in irrigation networks and the study of the existing malfunctions in the operation of irrigation networks, the sequence of works on the repair of irrigation networks were analyzed, and the priority of repair work was determined. The current state of the Khumbuz canal in Khiva, Khorezm region of the Republic of Uzbekistan was studied. Information was obtained and analyzed on compliance with design specifications during construction and the presence of protection zones in the canal design. Analytical indicators have been developed to extend the service life of the Khumbuz canal to ensure its normal operation and supply the required amount of water to crops. In the implementation of water supply to agricultural crops, priority is given to the repair and construction of hydraulic structures, including the Khumbuz canal. In addition, all the work to be done was planned based on the priority of the work. It has been found that the amount of water required to irrigate crops can be achieved uniformly along the length of the canal, at the top, middle, and bottom of the canal, by ensuring that the irrigation networks operate at the required level. Specific scientific recommendations have been given for the normal operation of the Khumbuz canal. Repairing the canal has been shown to increase water use by 20 percent and increase crop yields by 15 percent by ensuring that crops receive the required amount of water on time. The service area of the Khumbuz canal is 1.460 hectares. The length of the canal to be repaired is 6 km. of which 2,568 km of new concrete. The maximum water flow of the canal is 2.5 m3/sec, and the normal water flow is 2.0 m3/sec. The efficiency of the channel (canal) is 0.93. The article provides information on how to achieve efficient use of irrigation water by repairing hydraulic structures at the required level and the construction of new ones.
|