Summary: | Most mines choose the drilling and blasting method which has the characteristics of being a cheap and efficient method to fragment rock mass, but blast-induced ground vibration damages the surrounding rock mass and structure and is a drawback. To predict, analyze and control the blast-induced ground vibration, the random forest (RF) model, Harris hawks optimization (HHO) algorithm and Monte Carlo simulation approach were utilized. A database consisting of 137 datasets was collected at different locations around the Tonglvshan open-cast mine, China. Seven variables were selected and collected as the input variables, and peak particle velocity was chosen as the output variable. At first, an RF model and a hybrid model, namely a HHO-RF model, were developed, and the prediction results checked by 3 performance indices to show that the proposed HHO-RF model can provide higher prediction performance. Then blast-induced ground vibration was simulated by using the Monte Carlo simulation approach and the developed HHO-RF model. After analyzing, the mean peak particle velocity value was 0.98 cm/s, and the peak particle velocity value did not exceed 1.95 cm/s with a probability of 90%. The research results of this study provided a simple, accurate method and basis for predicting, evaluating blast-induced ground vibration and optimizing the blast design before blast operation.
|