The model of the space-time analogy in the optimization of the renovation order of buildings
The objective of the research was the problem of optimal priorities of the buildings' renovation or major repairs. The number of works can be great because of their short duration. This fact increases the computational processing time depending on linear increase of projects' number expone...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Peter the Great St. Petersburg Polytechnic University
2013-11-01
|
Series: | Инженерно-строительный журнал |
Subjects: | |
Online Access: | http://engstroy.spb.ru/index_2013_07/kotovskaya.pdf |
id |
doaj-e83f835860d640c5893413ee78824f64 |
---|---|
record_format |
Article |
spelling |
doaj-e83f835860d640c5893413ee78824f642020-11-25T02:56:28ZengPeter the Great St. Petersburg Polytechnic UniversityИнженерно-строительный журнал2071-47262071-03052013-11-01427515710.5862/MCE.42.7The model of the space-time analogy in the optimization of the renovation order of buildingsS.A. BolotinA.Kh. DadarM.A. KotovskayaThe objective of the research was the problem of optimal priorities of the buildings' renovation or major repairs. The number of works can be great because of their short duration. This fact increases the computational processing time depending on linear increase of projects' number exponentially. Uncertainty of the projects' characteristics increases with the time as well. For solving this problem the definition of serial importance of project was introduced and the dynamics of this serial importance was reviewed. The model of the space-time analogy based on the category of the aerial perspective and horizon was built. On the basis of application of this analogy the algorithm of the optimization of priorities in buildings' reconstruction or major repairs was suggested.http://engstroy.spb.ru/index_2013_07/kotovskaya.pdfspace-time analogyorder of constructionserial importance of the projectplanning horizonsteepest descent method |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
S.A. Bolotin A.Kh. Dadar M.A. Kotovskaya |
spellingShingle |
S.A. Bolotin A.Kh. Dadar M.A. Kotovskaya The model of the space-time analogy in the optimization of the renovation order of buildings Инженерно-строительный журнал space-time analogy order of construction serial importance of the project planning horizon steepest descent method |
author_facet |
S.A. Bolotin A.Kh. Dadar M.A. Kotovskaya |
author_sort |
S.A. Bolotin |
title |
The model of the space-time analogy in the optimization of the renovation order of buildings |
title_short |
The model of the space-time analogy in the optimization of the renovation order of buildings |
title_full |
The model of the space-time analogy in the optimization of the renovation order of buildings |
title_fullStr |
The model of the space-time analogy in the optimization of the renovation order of buildings |
title_full_unstemmed |
The model of the space-time analogy in the optimization of the renovation order of buildings |
title_sort |
model of the space-time analogy in the optimization of the renovation order of buildings |
publisher |
Peter the Great St. Petersburg Polytechnic University |
series |
Инженерно-строительный журнал |
issn |
2071-4726 2071-0305 |
publishDate |
2013-11-01 |
description |
The objective of the research was the problem of optimal priorities of the buildings' renovation or major repairs. The number of works can be great because of their short duration. This fact increases the computational processing time depending on linear increase of projects' number exponentially. Uncertainty of the projects' characteristics increases with the time as well. For solving this problem the definition of serial importance of project was introduced and the dynamics of this serial importance was reviewed. The model of the space-time analogy based on the category of the aerial perspective and horizon was built. On the basis of application of this analogy the algorithm of the optimization of priorities in buildings' reconstruction or major repairs was suggested. |
topic |
space-time analogy order of construction serial importance of the project planning horizon steepest descent method |
url |
http://engstroy.spb.ru/index_2013_07/kotovskaya.pdf |
work_keys_str_mv |
AT sabolotin themodelofthespacetimeanalogyintheoptimizationoftherenovationorderofbuildings AT akhdadar themodelofthespacetimeanalogyintheoptimizationoftherenovationorderofbuildings AT makotovskaya themodelofthespacetimeanalogyintheoptimizationoftherenovationorderofbuildings AT sabolotin modelofthespacetimeanalogyintheoptimizationoftherenovationorderofbuildings AT akhdadar modelofthespacetimeanalogyintheoptimizationoftherenovationorderofbuildings AT makotovskaya modelofthespacetimeanalogyintheoptimizationoftherenovationorderofbuildings |
_version_ |
1724713931286511616 |