Tensioning-Phase Box Girder Deformation Prediction Model Based on Ant Colony Algorithm and Residual Correction
The girder of prestressed concrete continuous box girder bridge strengthened by a stay cable system has a very complex deformation mechanism, and it is difficult to establish accurate numerical model for prediction. For these problems, a prediction method based on the combination of ant colony algor...
Main Authors: | Gangnian Xu, Youzhi Wang, Shangbin Liu, Shimin Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2018-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2018/1872578 |
Similar Items
-
Deformation Forecast of Main Girder Enhanced by Stay Cable System with Unequal Interval Grey Model and Residual Composite Correction
by: Gangnian Xu, et al.
Published: (2018-01-01) -
Innovation of Intelligent Tensioning in Precast Box Girder
by: Zheng Jianhao, et al.
Published: (2021-01-01) -
Residual Ultimate Strength of Box Girders with Variable Cracks
by: Lei Ao, et al.
Published: (2015-06-01) -
Prestressed concrete box girders of deformable cross-section
by: Danesi, R. F.
Published: (1977) -
Railway Bridge Using Small Post-Tensioned Concrete Box Girder
by: Inkyu Rhee
Published: (2012-06-01)