Multi-Year Stochastic Transmission Network Expansion Planning Considering Line Uprating
Transmission network expansion planning (TNEP) has become increasingly challenging due to the worldwide transformation of power systems, with the fast deployment of renewable energies as one of the key drivers. Given current socio-environmental concerns, building new lines to integrate new renewable...
Main Authors: | Ricardo Alvarez, Claudia Rahmann, Nicolas Cifuentes, Rodrigo Palma-Behnke |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2021-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9360537/ |
Similar Items
-
Increasing Electric Vehicle Penetration Using Smart Switching and Emergency Uprating
by: Shuran Liu, et al.
Published: (2021-07-01) -
Studi Pengaruh Pemasangan NGR 40 Ohm pada Uprating Transformator 2 GI Gianyar Terhadap Gangguan Hubung Singkat 1 Phasa Tanah
by: Arya Surya Darma, et al.
Published: (2017-08-01) -
Optimal Allocation of Wind Turbines by Considering Transmission Security Constraints and Power System Stability
by: Rodrigo Palma-Behnke, et al.
Published: (2013-01-01) -
Analisa Masuknya Gardu Induk Anggrek dan Rekonfigurasi Jaringan Terhadap Kualitas Tegangan dan Rugi-rugi Daya (Studi Kasus PLN Rayon Kwandang Area Gorontalo)
by: Muammar Zainuddin, et al.
Published: (2017-01-01) -
Study on characteristics of wind power transmission system with series compensation
by: Yan Li, et al.
Published: (2019-01-01)