Highway - corridor Vc geological of research subphase one in to his construction

In the seventies of the 20th century, by the UNDP and the Geneva initiative was launched, and later proposed improvement plan for the motorway network in Europe. As part of this plan was formed TEM project which envisages the construction of the highway Baltic Sea - Adriatic Sea (Baltic - Adriatic)....

Full description

Bibliographic Details
Main Author: Đurić Neđo
Format: Article
Language:English
Published: Faculty of civil engineering, Subotica 2014-01-01
Series:Zbornik Radova Građevinskog Fakulteta
Subjects:
Online Access:http://scindeks-clanci.ceon.rs/data/pdf/0352-6852/2014/0352-68521424013D.pdf
id doaj-e4ec86a6f1e84ad1b8bb3268b462085f
record_format Article
spelling doaj-e4ec86a6f1e84ad1b8bb3268b462085f2020-11-24T21:28:59ZengFaculty of civil engineering, SuboticaZbornik Radova Građevinskog Fakulteta0352-68522334-95732014-01-0120142413250352-68521424013DHighway - corridor Vc geological of research subphase one in to his constructionĐurić Neđo0University of Novi Sad, Faculty of Civil Engineering, Subotica, SerbiaIn the seventies of the 20th century, by the UNDP and the Geneva initiative was launched, and later proposed improvement plan for the motorway network in Europe. As part of this plan was formed TEM project which envisages the construction of the highway Baltic Sea - Adriatic Sea (Baltic - Adriatic). Corridor Vc is part of the TEM network - transport The infrastructure of Southeast Europe. At the beginning of the XXI century, initiated the construction of Corridor Vc, most of which passes through Bosnia and Herzegovina. The choice of route alternatives times the rod is based on the most favorable natural conditions of the terrain and road connectivity with major urban areas. Construction of the highway is planned for 15-20 years, per share, giving priority to traffic interesting stock and the ability to secure the necessary funds. One of SUBPHASE in construction time the research and study of the geological features of the ground, which in some parts of the motorway route, preferring the position of of the route. The paper gives an overview of the specific section of the highway in the Serbian Republic.http://scindeks-clanci.ceon.rs/data/pdf/0352-6852/2014/0352-68521424013D.pdfhighwaygeological researchdocumentationroutetravel facilities
collection DOAJ
language English
format Article
sources DOAJ
author Đurić Neđo
spellingShingle Đurić Neđo
Highway - corridor Vc geological of research subphase one in to his construction
Zbornik Radova Građevinskog Fakulteta
highway
geological research
documentation
route
travel facilities
author_facet Đurić Neđo
author_sort Đurić Neđo
title Highway - corridor Vc geological of research subphase one in to his construction
title_short Highway - corridor Vc geological of research subphase one in to his construction
title_full Highway - corridor Vc geological of research subphase one in to his construction
title_fullStr Highway - corridor Vc geological of research subphase one in to his construction
title_full_unstemmed Highway - corridor Vc geological of research subphase one in to his construction
title_sort highway - corridor vc geological of research subphase one in to his construction
publisher Faculty of civil engineering, Subotica
series Zbornik Radova Građevinskog Fakulteta
issn 0352-6852
2334-9573
publishDate 2014-01-01
description In the seventies of the 20th century, by the UNDP and the Geneva initiative was launched, and later proposed improvement plan for the motorway network in Europe. As part of this plan was formed TEM project which envisages the construction of the highway Baltic Sea - Adriatic Sea (Baltic - Adriatic). Corridor Vc is part of the TEM network - transport The infrastructure of Southeast Europe. At the beginning of the XXI century, initiated the construction of Corridor Vc, most of which passes through Bosnia and Herzegovina. The choice of route alternatives times the rod is based on the most favorable natural conditions of the terrain and road connectivity with major urban areas. Construction of the highway is planned for 15-20 years, per share, giving priority to traffic interesting stock and the ability to secure the necessary funds. One of SUBPHASE in construction time the research and study of the geological features of the ground, which in some parts of the motorway route, preferring the position of of the route. The paper gives an overview of the specific section of the highway in the Serbian Republic.
topic highway
geological research
documentation
route
travel facilities
url http://scindeks-clanci.ceon.rs/data/pdf/0352-6852/2014/0352-68521424013D.pdf
work_keys_str_mv AT đuricneđo highwaycorridorvcgeologicalofresearchsubphaseoneintohisconstruction
_version_ 1725968086707732480