Analisis Retrofit Lampu Di Kantor Wilayah BRI Denpasar Dengan Metode Life Cycle Cost

Lighting is one of the primary needs of humans wherever they are, because the presence of lighting will greatly help human activities and productivity. The more the number of people the need for lighting also increases. This means that it is directly proportional to electricity needs. In this study...

Full description

Bibliographic Details
Main Authors: Muhammad Hari Wijaya, Rukmi Sari Hartati, Wayan Gede Ariastina
Format: Article
Language:English
Published: Universitas Udayana 2019-08-01
Series:Majalah Ilmiah Teknologi Elektro
Online Access:https://ojs.unud.ac.id/index.php/JTE/article/view/49065
Description
Summary:Lighting is one of the primary needs of humans wherever they are, because the presence of lighting will greatly help human activities and productivity. The more the number of people the need for lighting also increases. This means that it is directly proportional to electricity needs. In this study the calculation of the savings of LED lights was carried out using the Life Cycle Cost (LCC) method in BRI Regional Office buildings in Denpasar. As a result, the replacement cost for the Philips brand LED costs Rp.145,093,000.00. Energy saving obtained is equal to 11,309.49 kWh per month, so the bill savings obtained with the electricity tariff per kWH Rp.1,117.00 is Rp.12,632,700.00 every month. The operational cost of LED lights was originally Rp.132,172,421.00 will experience a gradation of inflation rate of 4.2% so that during the life time of the lamp (4 years) it will be a total of Rp.562,939,535.08. The total LED LCC is Rp.708,032,535.08 with a period of 4 (four) years, while the total existing LCC lights are Rp.628,293,771.91 with a period of 2 (two) years. The economic feasibility study using the PBP method shows results that are feasible to be accepted, but for the NPV method, the IRR and PI show results that have not been properly received. Based on calculations using the NPV method and PI, it can be seen that to be a feasible outcome, the initial cost is a maximum of Rp.108,468,555.35.
ISSN:1693-2951
2503-2372