LOSS OF INFORMATION DURING DESIGN & CONSTRUCTION FOR HIGHWAYS ASSET MANAGEMENT: A GEOBIM PERSPECTIVE

Modern cities will have a catalytic role in regulating global economic growth and development, highlighting their role as centers of economic activity. With urbanisation being a consequence of that, the built environment is pressured to withstand the rapid increase in demand of buildings as well as...

Full description

Bibliographic Details
Main Authors: G. S. Floros, C. Ellul
Format: Article
Language:English
Published: Copernicus Publications 2021-10-01
Series:ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences
Online Access:https://www.isprs-ann-photogramm-remote-sens-spatial-inf-sci.net/VIII-4-W2-2021/83/2021/isprs-annals-VIII-4-W2-2021-83-2021.pdf
id doaj-e18c391ace29472ba3a9a48d7abaf250
record_format Article
spelling doaj-e18c391ace29472ba3a9a48d7abaf2502021-10-07T16:30:16ZengCopernicus PublicationsISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences2194-90422194-90502021-10-01VIII-4-W2-2021839010.5194/isprs-annals-VIII-4-W2-2021-83-2021LOSS OF INFORMATION DURING DESIGN & CONSTRUCTION FOR HIGHWAYS ASSET MANAGEMENT: A GEOBIM PERSPECTIVEG. S. Floros0C. Ellul1Dept. of Civil, Environmental & Geomatics Engineering, UCL, Gower Street, London, WC1E 6BT, UKDept. of Civil, Environmental & Geomatics Engineering, UCL, Gower Street, London, WC1E 6BT, UKModern cities will have a catalytic role in regulating global economic growth and development, highlighting their role as centers of economic activity. With urbanisation being a consequence of that, the built environment is pressured to withstand the rapid increase in demand of buildings as well as safe, resilient and sustainable transportation infrastructure. Transportation Infrastructure has a unique characteristic: it is interconnected and thus, it is essential for the stakeholders to be able to capture, analyse and visualise these interlinked relationships efficiently and effectively. This requirement is addressed by an Asset Information Management System (AIMS) which enables the capture of such information from the early stages of a transport infrastructure construction project. Building Information Modelling (BIM) and Geographic Information Science/Systems (GIS) are two domains which facilitate the authoring, management and exchange of asset information by providing the location underpinning, both in the short term and through the very long lifespan of the infrastructure. These systems are not interoperable by nature, with extensive Extract/Transform/Load procedures required when developing an integrated location-based Asset Management system, with consequent loss of information. The purpose of this paper is to provide an insight regarding the information lifecycle during Design and Construction on a Highways Project, focusing on identifying the stages in which loss of information can impact decision-making during operational Asset Management: (i) 3D Model to IFC, (ii) IFC to AIM and (iii) IFC to 3DGIS for AIM. The discussion highlights the significance of custom property sets and classification systems to bridge the different data structures as well as the power of 3D in visualizing Asset Information, with future work focusing on the potential of early BIM-GIS integration for operational AM.https://www.isprs-ann-photogramm-remote-sens-spatial-inf-sci.net/VIII-4-W2-2021/83/2021/isprs-annals-VIII-4-W2-2021-83-2021.pdf
collection DOAJ
language English
format Article
sources DOAJ
author G. S. Floros
C. Ellul
spellingShingle G. S. Floros
C. Ellul
LOSS OF INFORMATION DURING DESIGN & CONSTRUCTION FOR HIGHWAYS ASSET MANAGEMENT: A GEOBIM PERSPECTIVE
ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences
author_facet G. S. Floros
C. Ellul
author_sort G. S. Floros
title LOSS OF INFORMATION DURING DESIGN & CONSTRUCTION FOR HIGHWAYS ASSET MANAGEMENT: A GEOBIM PERSPECTIVE
title_short LOSS OF INFORMATION DURING DESIGN & CONSTRUCTION FOR HIGHWAYS ASSET MANAGEMENT: A GEOBIM PERSPECTIVE
title_full LOSS OF INFORMATION DURING DESIGN & CONSTRUCTION FOR HIGHWAYS ASSET MANAGEMENT: A GEOBIM PERSPECTIVE
title_fullStr LOSS OF INFORMATION DURING DESIGN & CONSTRUCTION FOR HIGHWAYS ASSET MANAGEMENT: A GEOBIM PERSPECTIVE
title_full_unstemmed LOSS OF INFORMATION DURING DESIGN & CONSTRUCTION FOR HIGHWAYS ASSET MANAGEMENT: A GEOBIM PERSPECTIVE
title_sort loss of information during design & construction for highways asset management: a geobim perspective
publisher Copernicus Publications
series ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences
issn 2194-9042
2194-9050
publishDate 2021-10-01
description Modern cities will have a catalytic role in regulating global economic growth and development, highlighting their role as centers of economic activity. With urbanisation being a consequence of that, the built environment is pressured to withstand the rapid increase in demand of buildings as well as safe, resilient and sustainable transportation infrastructure. Transportation Infrastructure has a unique characteristic: it is interconnected and thus, it is essential for the stakeholders to be able to capture, analyse and visualise these interlinked relationships efficiently and effectively. This requirement is addressed by an Asset Information Management System (AIMS) which enables the capture of such information from the early stages of a transport infrastructure construction project. Building Information Modelling (BIM) and Geographic Information Science/Systems (GIS) are two domains which facilitate the authoring, management and exchange of asset information by providing the location underpinning, both in the short term and through the very long lifespan of the infrastructure. These systems are not interoperable by nature, with extensive Extract/Transform/Load procedures required when developing an integrated location-based Asset Management system, with consequent loss of information. The purpose of this paper is to provide an insight regarding the information lifecycle during Design and Construction on a Highways Project, focusing on identifying the stages in which loss of information can impact decision-making during operational Asset Management: (i) 3D Model to IFC, (ii) IFC to AIM and (iii) IFC to 3DGIS for AIM. The discussion highlights the significance of custom property sets and classification systems to bridge the different data structures as well as the power of 3D in visualizing Asset Information, with future work focusing on the potential of early BIM-GIS integration for operational AM.
url https://www.isprs-ann-photogramm-remote-sens-spatial-inf-sci.net/VIII-4-W2-2021/83/2021/isprs-annals-VIII-4-W2-2021-83-2021.pdf
work_keys_str_mv AT gsfloros lossofinformationduringdesignampconstructionforhighwaysassetmanagementageobimperspective
AT cellul lossofinformationduringdesignampconstructionforhighwaysassetmanagementageobimperspective
_version_ 1716839190962896896