Improved Genetic Algorithm Integrated with Scheduling Rules for Flexible Job Shop Scheduling Problems

This paper presents optimization of makespan for Flexible Job Shop Scheduling Problems (FJSSP) using an Improved Genetic Algorithm integrated with Rules (IGAR). Machine assignment is done by Genetic Algorithm (GA) and operation selection is done using priority rules. Improvements in GA include a new...

Full description

Bibliographic Details
Main Authors: Kamal Amjad Muhammad, Ikramullah Butt Shahid, Anjum Naveed
Format: Article
Language:English
Published: EDP Sciences 2021-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/19/e3sconf_icpeme2021_02010.pdf
Description
Summary:This paper presents optimization of makespan for Flexible Job Shop Scheduling Problems (FJSSP) using an Improved Genetic Algorithm integrated with Rules (IGAR). Machine assignment is done by Genetic Algorithm (GA) and operation selection is done using priority rules. Improvements in GA include a new technique of adaptive probabilities and a new forced mutation technique that positively ensures the generation of new chromosome. The scheduling part also proposed an improved scheduling rule in addition to four standard rules. The algorithm is tested against two well-known benchmark data set and results are compared with various algorithms. Comparison shows that IGAR finds known global optima in most of the cases and produces improved results as compared to other algorithms.
ISSN:2267-1242