The moving-slab Heating in the furnace for various production plans
The reheating furnace in occasional production time has to be charged with slabs having fifferent sizes in length, ridth and thickness. This production plan was put due to economical and productivity consideration. Moreover in the future development, the slab grade might be improved to hight grades....
Main Authors: | Istadi Istadi, Y. Bindar, Koswara Koswara |
---|---|
Format: | Article |
Language: | English |
Published: |
Diponegoro University
2017-06-01
|
Series: | Reaktor |
Subjects: | |
Online Access: | https://ejournal.undip.ac.id/index.php/reaktor/article/view/14935 |
Similar Items
-
A feasibility to electrify the combustion heated walking beam furnace : Applying induction and resistance heating
by: Berger, Rikard, et al.
Published: (2018) -
Optimizing the model of heating the material in the reheating furnace in metallurgy
by: I. Špička, et al.
Published: (2016-10-01) -
Computational Modelling Of Heat Transfer In Reheat Furnaces
by: Harish, J
Published: (2006) -
Two Dimensional Thermal-Hydraulic Analysis for a Packed Bed Regenerator Used in a Reheating Furnace
by: Chien-Nan Lin, et al.
Published: (2016-11-01) -
Implementation of an Organic Rankine cycle on a Stepping furnace
by: Pižorn, Žiga
Published: (2014)