Probabilistic day-ahead simultaneous active/reactive power management in active distribution systems
Distributed generations (DGs) are main components for active distribution networks (ADNs). Owing to the large number of DGs integrated into distribution levels, it will be essential to schedule active and reactive power resources in ADNs. Generally, energy and reactive power scheduling problems are...
Main Author: | Abouzar Samimi |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2019-01-01
|
Series: | Journal of Modern Power Systems and Clean Energy |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/8964535/ |
Similar Items
-
Complete active-reactive power resource scheduling of smart distribution system with high penetration of distributed energy resources
by: Abouzar SAMIMI, et al.
Published: (2017-11-01) -
Coordinated Volt/Var Control in Distribution Systems with Distributed Generations Based on Joint Active and Reactive Powers Dispatch
by: Abouzar Samimi, et al.
Published: (2016-01-01) -
The Impact of Uncertainty and Time Structure on Optimal Flexibility Scheduling in Active Distribution Networks
by: Guray Kara, et al.
Published: (2021-01-01) -
Optimal Day-Ahead Scheduling of a Smart Distribution Grid Considering Reactive Power Capability of Distributed Generation
by: Rongxiang Yuan, et al.
Published: (2016-04-01) -
Goal Programming Application for Contract Pricing of Electric Vehicle Aggregator in Join Day-Ahead Market
by: Parinaz Aliasghari, et al.
Published: (2020-04-01)