Development of a Model for Predicting Probabilistic Life-Cycle Cost for the Early Stage of Public-Office Construction
Decisions made in the early stages of construction projects significantly influence the costs incurred in subsequent stages. Therefore, such decisions must be based on the life-cycle cost (LCC), which includes the maintenance, repair, and replacement (MRR) costs in addition to construction costs. Fu...
Main Authors: | Zhengxun Jin, Jonghyeob Kim, Chang-taek Hyun, Sangwon Han |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2019-07-01
|
Series: | Sustainability |
Subjects: | |
Online Access: | https://www.mdpi.com/2071-1050/11/14/3828 |
Similar Items
-
Probabilistic Maintenance Cost Analysis for Aged Multi-Family Housing
by: Moonsun Park, et al.
Published: (2019-03-01) -
Life Cycle Cost Analysis of Three Types of Power Lines in 10 kV Distribution Network
by: Zhenyu Zhu, et al.
Published: (2016-10-01) -
A study on the development of a cost model based on the owner's decision making at the early stages of a construction project
by: Choong-Wan Koo, et al.
Published: (2010-04-01) -
Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings under Conditions of Exposure to Risk
by: Edyta Plebankiewicz, et al.
Published: (2019-12-01) -
A Conceptual Study on the Monte Carlo Simulation for Cost Forecasting in the Green Building Project
by: Halil, FM, et al.
Published: (2020)