Prioritization of R&D projects in the aerospace sector: AHP method with ratings
The prioritization of R&D projects in the Aerospace Sector is considered a complex problem because it involves qualitative and quantitative issues that are frequently conflicting. This paper aimed to apply the AHP (Analytic Hierarchy Process) method with ratings to select projects of R&D in...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Departamento de Ciência e Tecnologia Aeroespacial
2010-09-01
|
Series: | Journal of Aerospace Technology and Management |
Subjects: | |
Online Access: | http://www.jatm.com.br/papers/vol2_n3/JATMv2n3_p339-348_Priorization_of_R_and_D_projects_in_the_Aerospace_Sector_AHP_method_with_ratings.pdf |
id |
doaj-dde605556b324b84a98ae6d68fcf88b9 |
---|---|
record_format |
Article |
spelling |
doaj-dde605556b324b84a98ae6d68fcf88b92020-11-24T21:37:54ZengDepartamento de Ciência e Tecnologia AeroespacialJournal of Aerospace Technology and Management1984-96482175-91462010-09-0123339348Prioritization of R&D projects in the aerospace sector: AHP method with ratingsMischel Carmen N. BelderrainFrancisco Carlos M. PantojaAmanda C. Simões da SilvaThe prioritization of R&D projects in the Aerospace Sector is considered a complex problem because it involves qualitative and quantitative issues that are frequently conflicting. This paper aimed to apply the AHP (Analytic Hierarchy Process) method with ratings to select projects of R&D in a Brazilian aerospace institution, Department of Science and Aerospace Technology (DCTA). The results showed that using ratings is appropriate when there is a great quantity of projects, since it reduces the judgments required to the decision maker.http://www.jatm.com.br/papers/vol2_n3/JATMv2n3_p339-348_Priorization_of_R_and_D_projects_in_the_Aerospace_Sector_AHP_method_with_ratings.pdfPrioritization of Research and Development Projects (R&D)AHPRatings |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Mischel Carmen N. Belderrain Francisco Carlos M. Pantoja Amanda C. Simões da Silva |
spellingShingle |
Mischel Carmen N. Belderrain Francisco Carlos M. Pantoja Amanda C. Simões da Silva Prioritization of R&D projects in the aerospace sector: AHP method with ratings Journal of Aerospace Technology and Management Prioritization of Research and Development Projects (R&D) AHP Ratings |
author_facet |
Mischel Carmen N. Belderrain Francisco Carlos M. Pantoja Amanda C. Simões da Silva |
author_sort |
Mischel Carmen N. Belderrain |
title |
Prioritization of R&D projects in the aerospace sector: AHP method with ratings |
title_short |
Prioritization of R&D projects in the aerospace sector: AHP method with ratings |
title_full |
Prioritization of R&D projects in the aerospace sector: AHP method with ratings |
title_fullStr |
Prioritization of R&D projects in the aerospace sector: AHP method with ratings |
title_full_unstemmed |
Prioritization of R&D projects in the aerospace sector: AHP method with ratings |
title_sort |
prioritization of r&d projects in the aerospace sector: ahp method with ratings |
publisher |
Departamento de Ciência e Tecnologia Aeroespacial |
series |
Journal of Aerospace Technology and Management |
issn |
1984-9648 2175-9146 |
publishDate |
2010-09-01 |
description |
The prioritization of R&D projects in the Aerospace Sector is considered a complex problem because it involves qualitative and quantitative issues that are frequently conflicting. This paper aimed to apply the AHP (Analytic Hierarchy Process) method with ratings to select projects of R&D in a Brazilian aerospace institution, Department of Science and Aerospace Technology (DCTA). The results showed that using ratings is appropriate when there is a great quantity of projects, since it reduces the judgments required to the decision maker. |
topic |
Prioritization of Research and Development Projects (R&D) AHP Ratings |
url |
http://www.jatm.com.br/papers/vol2_n3/JATMv2n3_p339-348_Priorization_of_R_and_D_projects_in_the_Aerospace_Sector_AHP_method_with_ratings.pdf |
work_keys_str_mv |
AT mischelcarmennbelderrain prioritizationofrdprojectsintheaerospacesectorahpmethodwithratings AT franciscocarlosmpantoja prioritizationofrdprojectsintheaerospacesectorahpmethodwithratings AT amandacsimoesdasilva prioritizationofrdprojectsintheaerospacesectorahpmethodwithratings |
_version_ |
1725936523087446016 |