Technical and economical problems of integration of IX B and XI D international railway transport corridors into European railway transport network

Technical and economical problems of train speed increment up to 160 km/h in existing IX B and IX D international railway transport corridors are analysed. Train speed restriction reasons, values of restrictions and their locations are estimated according to technical parameter characteristics of ex...

Full description

Bibliographic Details
Main Authors: L. Černiauskaitė, K. Sakalauskas
Format: Article
Language:English
Published: Vilnius Gediminas Technical University 2003-08-01
Series:Transport
Subjects:
Online Access:http://www.transport.vgtu.lt/upload/tif_zur/2003-4-cerniauskaite_sakalauskas.pdf
id doaj-dd51ecfec20d4679a9e077b2184210a8
record_format Article
spelling doaj-dd51ecfec20d4679a9e077b2184210a82021-07-02T09:21:08ZengVilnius Gediminas Technical UniversityTransport1648-41421648-34802003-08-01184143152Technical and economical problems of integration of IX B and XI D international railway transport corridors into European railway transport networkL. ČerniauskaitėK. SakalauskasTechnical and economical problems of train speed increment up to 160 km/h in existing IX B and IX D international railway transport corridors are analysed. Train speed restriction reasons, values of restrictions and their locations are estimated according to technical parameter characteristics of existing railway line infrastructure and according to the requirements for high-speed trains. The concept railway lines technical shape includes: plan, longitudinal profile, road upper construction and subgrade, besides quantitative and qualitative indices of elements. The most important indicator of railway lines technical shape is the permissible speed of trains. The radius of lying curves is taken as the most important investigation object in the analysis of geometry of railway lines plan. Computer programme "Trauka" ("Traction") is used for the solution of problems of train speed increase. The programme is intended to calculate train speed and train driving time by evaluating the technical level of existing railway lines infrastructure. Great attention is paid to a complex analysis of road plan, longitudinal profile and upper road structure elements when railway lines infrastructure reconstruction is carried out. The application of these methods in practice allows the exact estimation of train speed increment possibilities when speed restriction reasons are eliminated.http://www.transport.vgtu.lt/upload/tif_zur/2003-4-cerniauskaite_sakalauskas.pdfthe AGC and AGTC agreementstechnical level of infrastructuretraction calculationspeed restrictionstrain speedtrain driving timeplan curve
collection DOAJ
language English
format Article
sources DOAJ
author L. Černiauskaitė
K. Sakalauskas
spellingShingle L. Černiauskaitė
K. Sakalauskas
Technical and economical problems of integration of IX B and XI D international railway transport corridors into European railway transport network
Transport
the AGC and AGTC agreements
technical level of infrastructure
traction calculation
speed restrictions
train speed
train driving time
plan curve
author_facet L. Černiauskaitė
K. Sakalauskas
author_sort L. Černiauskaitė
title Technical and economical problems of integration of IX B and XI D international railway transport corridors into European railway transport network
title_short Technical and economical problems of integration of IX B and XI D international railway transport corridors into European railway transport network
title_full Technical and economical problems of integration of IX B and XI D international railway transport corridors into European railway transport network
title_fullStr Technical and economical problems of integration of IX B and XI D international railway transport corridors into European railway transport network
title_full_unstemmed Technical and economical problems of integration of IX B and XI D international railway transport corridors into European railway transport network
title_sort technical and economical problems of integration of ix b and xi d international railway transport corridors into european railway transport network
publisher Vilnius Gediminas Technical University
series Transport
issn 1648-4142
1648-3480
publishDate 2003-08-01
description Technical and economical problems of train speed increment up to 160 km/h in existing IX B and IX D international railway transport corridors are analysed. Train speed restriction reasons, values of restrictions and their locations are estimated according to technical parameter characteristics of existing railway line infrastructure and according to the requirements for high-speed trains. The concept railway lines technical shape includes: plan, longitudinal profile, road upper construction and subgrade, besides quantitative and qualitative indices of elements. The most important indicator of railway lines technical shape is the permissible speed of trains. The radius of lying curves is taken as the most important investigation object in the analysis of geometry of railway lines plan. Computer programme "Trauka" ("Traction") is used for the solution of problems of train speed increase. The programme is intended to calculate train speed and train driving time by evaluating the technical level of existing railway lines infrastructure. Great attention is paid to a complex analysis of road plan, longitudinal profile and upper road structure elements when railway lines infrastructure reconstruction is carried out. The application of these methods in practice allows the exact estimation of train speed increment possibilities when speed restriction reasons are eliminated.
topic the AGC and AGTC agreements
technical level of infrastructure
traction calculation
speed restrictions
train speed
train driving time
plan curve
url http://www.transport.vgtu.lt/upload/tif_zur/2003-4-cerniauskaite_sakalauskas.pdf
work_keys_str_mv AT lcerniauskaite technicalandeconomicalproblemsofintegrationofixbandxidinternationalrailwaytransportcorridorsintoeuropeanrailwaytransportnetwork
AT ksakalauskas technicalandeconomicalproblemsofintegrationofixbandxidinternationalrailwaytransportcorridorsintoeuropeanrailwaytransportnetwork
_version_ 1721333290701422592