CONSTRUCTION OF NEW MULTI-FUNCTION TYPE ARTIFICIAL BOUNDARY PILLAR FOR TRANSITION FROM OPEN PIT TO UNDERGROUND MINING
In allusion to the defects of large material consumption and high construction cost of conventional artificial boundary pillar for the transition from open pit to underground mining, a new multi-function type of artificial boundary pillar scheme of reinforced concrete is proposed, which creates favo...
Main Authors: | Honggang Ren, Zhuoying Tan, Panxue Feng |
---|---|
Format: | Article |
Language: | ces |
Published: |
Czech Technical University, Prague
2019-04-01
|
Series: | Civil Engineering Journal |
Subjects: | |
Online Access: | http://www.civilengineeringjournal.cz/archive/issues/2019/2019_1/CEJ-1-2019-0008-(89-102).pdf |
Similar Items
-
Investigation of underground mine pillar design procedures
by: Potvin, Yves
Published: (2010) -
Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining
by: Rafiq Sulistyo, et al.
Published: (2011-04-01) -
Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining
by: Rafiq Sulistyo, et al.
Published: (2011-04-01) -
Safety Analysis of Synergetic Operation of Backfilling the Open Pit Using Tailings and Excavating the Ore Deposit Underground
by: Qinli Zhang, et al.
Published: (2021-07-01) -
Predicting the Pillar Stability of Underground Mines with Random Trees and C4.5 Decision Trees
by: Mahmood Ahmad, et al.
Published: (2020-09-01)