Computational Algorithms Supporting the Bridge Management System
This paper presents a novel approach to the creation of a ranking list of bridges with the highest priority for repair, renovation or exchange. Two main aspects addressed herein are studied. First concerning parameters, which must be taken into account while creating the list of bridges with priorit...
Main Authors: | Lucjan Janas, Bartosz Miller, Adam Kaszyński |
---|---|
Format: | Article |
Language: | English |
Published: |
RTU Press
2018-12-01
|
Series: | The Baltic Journal of Road and Bridge Engineering |
Subjects: | |
Online Access: | https://bjrbe-journals.rtu.lv/article/view/2498 |
Similar Items
-
Renovation Management Method in Neglected Buildings
by: Beata Nowogońska, et al.
Published: (2021-01-01) -
Consequences of improper renovation decisions in a 17th century half-timbered building
by: Beata Nowogońska
Published: (2020-12-01) -
Technical Aspects of Renovation of the 16th-Century Roof Truss
by: Nowogońska Beata
Published: (2019-12-01) -
Toward an Egyptian Bridge Management System
by: Ahmed M. Saleh, et al.
Published: (2013-12-01) -
Technical Problems in the Renovation of Historic Bridges. Case Study – Road Bridge in Cigacice
by: Mielczarek Magdalena, et al.
Published: (2021-03-01)